How To Fix AIS2204 - Project &1: WBS element &2 is not a planning element (see profile &3)


SAP Error Message - Details

  • Message type: E = Error

  • Message class: AIS2 - Pushback IM

  • Message number: 204

  • Message text: Project &1: WBS element &2 is not a planning element (see profile &3)

  • Show details Hide details


  • Self-Explanatory Message

    Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.

    To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.

    Unfortunately, there isn't any extra information in this error notice.



    What else can you do?

    First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).

    Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.

    You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.


Smart SAP Assistant

  • What is the cause and solution for SAP error message AIS2204 - Project &1: WBS element &2 is not a planning element (see profile &3) ?

    The SAP error message AIS2204 indicates that a specific Work Breakdown Structure (WBS) element is not recognized as a planning element in the context of project management. This can occur for various reasons, and understanding the cause and potential solutions is essential for resolving the issue.

    Cause:

    1. WBS Element Configuration: The WBS element may not be configured as a planning element in the project profile. This can happen if the WBS element is set up incorrectly or if the project profile does not allow planning for that specific WBS element.
    2. Project Profile Settings: The project profile associated with the project may not have the necessary settings enabled to allow planning at the WBS level.
    3. Status of WBS Element: The WBS element might be in a status that does not permit planning activities (e.g., it could be closed or locked).
    4. Hierarchy Issues: The WBS element may not be correctly positioned within the project hierarchy, leading to issues with its recognition as a planning element.

    Solution:

    1. Check WBS Element Configuration:

      • Navigate to the WBS element in the SAP system and verify its configuration.
      • Ensure that the WBS element is marked as a planning element.
    2. Review Project Profile:

      • Go to the project profile settings and check if the planning options are enabled for the WBS elements.
      • If necessary, modify the project profile to allow planning for the relevant WBS elements.
    3. Verify WBS Element Status:

      • Check the status of the WBS element to ensure it is active and not in a closed or locked state.
      • If it is locked, you may need to unlock it or change its status to allow planning.
    4. Hierarchy Check:

      • Ensure that the WBS element is correctly positioned within the project hierarchy.
      • If there are issues with the hierarchy, you may need to adjust the structure to ensure proper recognition.
    5. Consult Documentation:

      • Refer to SAP documentation or help resources for additional guidance on configuring WBS elements and project profiles.
    6. Contact SAP Support:

      • If the issue persists after checking the above points, consider reaching out to SAP support for further assistance.

    Related Information:

    • Transaction Codes: You may use transaction codes like CJ20N (Project Builder) or CJ02 (Change WBS Element) to access and modify WBS elements and project profiles.
    • SAP Notes: Check for any relevant SAP Notes that may address specific issues related to WBS elements and planning.
    • User Roles and Authorizations: Ensure that you have the necessary authorizations to make changes to WBS elements and project profiles.

    By following these steps, you should be able to identify the cause of the AIS2204 error and implement the appropriate solution.

    • Do you have any question about this error?


      Upgrade now to chat with this error.


Instant HelpGet instant SAP help. Start your 7-day free trial now.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
The AI Support Assistant is great. It provides comprehensive assistance even on the most difficult issues. I highly recommend this service.
Rate 1
John Jordan
SAP Consultant & Author