Message type: E = Error
Message class: AH - IS-U billing (master data)
Message number: 385
Message text: Installation &1: contract &2 must be billed first
You have attempted to bill contract &v3& for installation &v1&. This is
not possible because contract &v2& was already allocated to the
installation, and final billing has not been executed yet for this
contract.
First execute final billing for contract &v2&. Then you can bill
contract &v3&.
Error message extract from SAP system. Copyright SAP SE.
AH385
- Installation &1: contract &2 must be billed first ?The SAP error message AH385 indicates that there is a billing issue related to a contract in the system. Specifically, it means that a certain contract must be billed before the installation can proceed. This error typically arises in the context of SAP's Contract Accounts Receivable and Payable (FI-CA) or in the context of billing processes in SAP IS-U (Industry Solution for Utilities).
Cause: Billing Sequence: The error occurs when there is a defined billing sequence that requires a specific contract to be billed before the installation can be processed. This is often due to dependencies between contracts and installations. Contract Status: The contract in question may not be in a status that allows it to be billed (e.g., it may be inactive or not fully set up).
Configuration Issues: There may be configuration settings in the system that dictate the billing order, which could be causing this error.
Solution: Check Contract Status: Verify the status
Get instant SAP help. Sign up for our Free Essentials Plan.
AH384
Inst. &1 scheduled bill. date &2 bill. procedure &3: status &4 incorrect
What causes this issue? In billing, the system has established that the status of the billing order that was specified when it was first created is n...
AH383
Date check: &1 &2 after &3 &4
What causes this issue? The following inconsistent date configuration was found during validation of limitation dates in billing: &V1& &V...
AH386
Rate &1 updated; check indicators
What causes this issue? You updated rate &V1& in schema &V2&. The following activities were carried out: All steps for rate &V1&a...
AH387
Rate &1 is complete
What causes this issue? If you add new steps to a rate, then the rate must be updated in all schemas in which it is used. The missing rate steps are ...