Do you have any question about this error?
Message type: E = Error
Message class: AG - Nachrichten ATP-Server
Message number: 003
Message text: Replenishment lead time for material &1 (plant &2) is 0 days
Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.
To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.
Unfortunately, there isn't any extra information in this error notice.
First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).
Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.
You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.
AG003
- Replenishment lead time for material &1 (plant &2) is 0 days ?The SAP error message AG003 indicates that the replenishment lead time for a specific material in a particular plant is set to 0 days. This can cause issues in inventory management and planning, as the system relies on lead time to determine when to reorder stock.
Cause:
- Configuration Issue: The replenishment lead time may not have been set correctly in the material master data.
- Data Entry Error: During the creation or update of the material master, the lead time might have been inadvertently set to 0.
- Material Type: Certain material types may not require a lead time, but if they are used in a context that does, this can lead to the error.
- Planning Parameters: If the material is part of a planning run, the system may expect a lead time to calculate when to reorder.
Solution:
Update Material Master:
- Go to the material master record for the affected material (transaction code MM02).
- Navigate to the relevant views (e.g., MRP view) and check the "Replenishment Lead Time" field.
- Set a valid lead time (greater than 0) based on your business requirements.
Check MRP Settings:
- Ensure that the MRP settings for the material are correctly configured. This includes checking the MRP type and other related parameters.
Review Material Type:
- If the material type does not require a lead time, ensure that it is being used correctly in the planning context.
Consult Documentation:
- Review SAP documentation or consult with your SAP support team for specific guidelines on lead time settings for your organization.
Testing:
- After making changes, run a test planning run to ensure that the error is resolved and that the system behaves as expected.
Related Information:
By addressing the lead time setting in the material master, you should be able to resolve the AG003 error and ensure proper inventory management processes.
Get instant SAP help. Start your 7-day free trial now.
AG002
Error in RFC call-up: &1, &2
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
AG001
Check the settings for checking group &1 and checking rule &2
What causes this issue? The system could not determine any checking rules / a valid checking group for the availability check.System Response In ord...
AG004
Sales order item number not specified in requirement
What causes this issue? A requirement with the special procurement indicator 'make-to-order production' has been transferred to the availab...
AG005
Project item number not specified in a requirement
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
Click on this link to search all SAP messages.