Message type: E = Error
Message class: ACE - Nachrichten zur Accrual Engine
Message number: 507
Message text: Accrual object &1/&2 has already been finished prematurely
You are trying to calculate (and perhaps also to post) periodic accruals
for the following accrual object:
Accrual object (internal display): &V1&
Accrual subobject (internal display): &V2&
However, this accrual object has the status <LS>Prematurely Finished</>.
This status was set on &V3& (premature finish date).
When processing was started, &V4& was entered as the key date for
calculating the accrual.
The periodic accrual is to be performed on key date &V4&. This date is
after the premature finish date.
On the key date, the system posts the remaining amount as a periodic
accrual that has not yet been accrued.
For more information, see
<DS:TX.ACEPS_DEACTIVATION_EXAMPLE>here</>.
The system issues an error message and will not allow you to continue with this transaction until the error is resolved.
Error message extract from SAP system. Copyright SAP SE.
ACE507
- Accrual object &1/&2 has already been finished prematurely ?The SAP error message ACE507 indicates that an accrual object has been marked as finished prematurely. This typically occurs in the context of accrual accounting, where certain financial transactions are recorded in a way that reflects their economic reality, even if the cash flow has not yet occurred.
Cause: The error can arise due to several reasons: Incorrect Status: The accrual object (e.g., a contract, project, or service) may have been incorrectly set to a finished status before all necessary transactions or postings were completed. Manual Intervention: A user may have manually changed the status of the accrual object, leading to inconsistencies in the system. System Errors: There may be a bug or issue in the SAP system that caused the status to be updated incorrectly. Data Integrity Issues: There could be issues with the underlying data, such as missing or incorrect entries that prevent the accrual from being processed correctly.
Solution: To resolve the ACE507 error, you
Get instant SAP help. Sign up for our Free Essentials Plan.
ACE505
Simulation not permitted between &1 and &2: Posting frequency is &3
What causes this issue? A simulation is to be carried out with Start date: &V1& End date (key date): &V2& Im Customizing for the Accr...
ACE504
Simulation is not permitted: Start date &1 later than key date &2
What causes this issue? You want to carry out a simulation for Accrual Engine data. The key date (end date) for simulation &V1& was either en...
ACE508
Error occurred while processing a BAdI
What causes this issue? An error occurred while the BAdI ACEPS_PREFETCH_DATA_INTERN was being processed.System Response The system issues an error m...
ACE509
Error occurred while processing a BAdI
What causes this issue? An error occurred while BAdI ACEPS_PREFETCH_DATA_CUSTOMER was being processed.System Response The system issues an error mes...