Message type: E = Error
Message class: ACE - Nachrichten zur Accrual Engine
Message number: 504
Message text: Simulation is not permitted: Start date &1 later than key date &2
You want to carry out a simulation for Accrual Engine data.
The key date (end date) for simulation &V1& was either entered manually
by the user or determined/adjusted by the system.
The system adjusts the key date to the end of the accrual object's
period of validity.
As start date for the simulation, the system determined date &V2&.
The start date is set as
the day following the last actual posting, or, if no postings have been
made yet,
the start of the accrual object's period of validity.
The following accrual object is affected:
Internal presentation of the accrual object (GUID): &V3&
Internal presentation of the accrual subobject: &V4&
The start date for the simulation is later than the end date.
It is therefore not possible to carry out a simulation for this accrual
object.
The system issues an error message and will not allow you to continue with this transaction until the error is resolved.
Error message extract from SAP system. Copyright SAP SE.
ACE504
- Simulation is not permitted: Start date &1 later than key date &2 ?The SAP error message ACE504, which states "Simulation is not permitted: Start date &1 later than key date &2," typically occurs in the context of simulations in SAP, particularly in modules related to financial planning, controlling, or project management. This error indicates that the start date for the simulation you are trying to run is later than the key date that has been set in the system, which is not allowed.
Cause: Date Configuration: The start date you are trying to use for the simulation is set to a date that is after the key date. The key date is often used as a reference point for various calculations and simulations. Business Logic: The business process or logic defined in the system may restrict simulations to only occur on or before the key date to ensure data integrity and accuracy. User Input Error: The user may have inadvertently entered an incorrect start date.
Solution: Check Dates:
Get instant SAP help. Sign up for our Free Essentials Plan.
ACE503
No actual posting data exists before simulation key date &1
What causes this issue? You want to simulate data in the Accrual Engine up to date &V1&. Up to this date, there are actual postings on this a...
ACE502
The validity of the accrual object begins after the simulation key date
What causes this issue? You want to simulate data in the Accrual Engine up to date &V1&. However, the accrual object for which you want to ca...
ACE505
Simulation not permitted between &1 and &2: Posting frequency is &3
What causes this issue? A simulation is to be carried out with Start date: &V1& End date (key date): &V2& Im Customizing for the Accr...
ACE507
Accrual object &1/&2 has already been finished prematurely
What causes this issue? You are trying to calculate (and perhaps also to post) periodic accruals for the following accrual object: Accrual object (in...
Click on this link to search all SAP messages.