How To Fix /ACCGO/CCK_DPQS368 - &1 schedule validity does not exist within the contract creation date


/ACCGO/CCK_DPQS368 - Overview

  • Message type: E = Error

  • Message class: /ACCGO/CCK_DPQS -

  • Message number: 368

  • Message text: &1 schedule validity does not exist within the contract creation date

  • Show details Hide details


  • Self-Explanatory Message

    Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.

    To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.

    Unfortunately, there isn't any extra information in this error notice.



    What else can you do?

    First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).

    Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.

    You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.


Smart SAP Assistant

  • What is the cause and solution for SAP error message /ACCGO/CCK_DPQS368 - &1 schedule validity does not exist within the contract creation date ?
    The SAP error message /ACCGO/CCK_DPQS368 &1 schedule validity does not exist within the contract creation date typically occurs in the context of contract management, particularly when dealing with scheduling and validity periods for contracts in SAP.
    
    Cause: This error indicates that the schedule validity period for the contract you are trying to create or modify does not align with the contract's creation date. Specifically, it means that the date range defined for the schedule (start and end dates) does not include the date on which the contract is being created or modified.
    Solution: To resolve this error, you can take the following steps: Check Contract Creation Date: Verify the date on which you are trying to create or modify the contract. Ensure that it falls within the defined schedule validity period. Review Schedule Validity: Go to the schedule settings for the contract and check the validity dates. Make sure that the start date is before or

    Already have an account? Login here!




Instant HelpGet instant SAP help. Sign up for our Free Essentials Plan.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
The AI Support Assistant is great. It provides comprehensive assistance even on the most difficult issues. I highly recommend this service.
Rate 1
John Jordan
SAP Consultant & Author