How To Fix 7A324 - Maximum POC less than initial POC


7A324 - Overview

  • Message type: E = Error

  • Message class: 7A - PS Progress Analysis

  • Message number: 324

  • Message text: Maximum POC less than initial POC

  • Show details Hide details


  • Self-Explanatory Message

    Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.

    To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.

    Unfortunately, there isn't any extra information in this error notice.



    What else can you do?

    First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).

    Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.

    You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.


Smart SAP Assistant

  • What is the cause and solution for SAP error message 7A324 - Maximum POC less than initial POC ?
    The SAP error message 7A324: Maximum POC less than initial POC typically occurs in the context of Project System (PS) or related modules where there is a discrepancy between the planned or initial percentage of completion (POC) and the maximum allowable percentage of completion for a project or task.
    
    Cause: This error arises when the system detects that the maximum percentage of completion (POC) set for a project or task is less than the initial percentage of completion that has been recorded. This situation can occur due to: Incorrect Configuration: The maximum POC might have been set incorrectly in the project settings. Data Entry Errors: The initial POC might have been entered incorrectly, leading to a situation where it exceeds the maximum allowed. Changes in Project Scope: If the project scope has changed, the maximum POC may need to be adjusted accordingly.
    Solution: To resolve this error, you can take the following steps: Check Project Settings: Navigate to the

    Already have an account? Login here!




Instant HelpGet instant SAP help. Sign up for our Free Essentials Plan.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
The AI Support Assistant is great. It provides comprehensive assistance even on the most difficult issues. I highly recommend this service.
Rate 1
John Jordan
SAP Consultant & Author