Do you have any question about this error?
Message type: E = Error
Message class: 7A - PS Progress Analysis
Message number: 322
Message text: Delete the reference object or choose an approproate measurement method
Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.
To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.
Unfortunately, there isn't any extra information in this error notice.
First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).
Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.
You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.
7A322
- Delete the reference object or choose an approproate measurement method ?The SAP error message 7A322, which states "Delete the reference object or choose an appropriate measurement method," typically occurs in the context of SAP's Project System (PS) or Controlling (CO) modules. This error indicates that there is an issue with the measurement method or reference object associated with a particular project or cost object.
Cause:
- Reference Object Issue: The reference object (like a WBS element, internal order, or cost center) may not be valid or may have been deleted.
- Measurement Method: The measurement method defined for the project or cost object may not be appropriate for the current context or may not exist.
- Configuration Issues: There may be configuration settings in the system that do not align with the current project or cost object settings.
Solution:
Check Reference Object:
- Verify if the reference object (WBS element, internal order, etc.) exists and is active.
- If the reference object has been deleted, you may need to create a new one or restore the deleted object if possible.
Review Measurement Method:
- Check the measurement method assigned to the project or cost object. Ensure that it is appropriate for the type of project you are working on.
- If necessary, change the measurement method to one that is valid for your scenario.
Configuration Review:
- Review the configuration settings in the SAP system related to the Project System or Controlling modules. Ensure that all settings align with the requirements of your project.
- Consult with your SAP configuration team to ensure that the settings are correct.
Consult Documentation:
- Refer to SAP documentation or help resources for specific guidance on the error message and its context.
SAP Notes:
- Check the SAP Support Portal for any relevant SAP Notes that may address this specific error message. There may be patches or updates that resolve known issues.
Testing:
- After making changes, test the process again to ensure that the error has been resolved.
Related Information:
By following these steps, you should be able to identify the root cause of the error and implement a suitable solution.
Get instant SAP help. Start your 7-day free trial now.
7A321
No progress version has been created in controlling area &
What causes this issue? You have not created a progess version in controlling area &V1&.System Response The system issues an error message a...
7A320
Choose a project definition or a WBS element
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
7A323
Enter a reference object
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
7A324
Maximum POC less than initial POC
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
Click on this link to search all SAP messages.