How To Fix 6P428 - From requirements date is greater than to requirements date


6P428 - Overview

  • Message type: E = Error

  • Message class: 6P - Messages for planned independent requirements (Appl.area 60)

  • Message number: 428

  • Message text: From requirements date is greater than to requirements date

  • Show details Hide details


  • Self-Explanatory Message

    Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.

    To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.

    Unfortunately, there isn't any extra information in this error notice.



    What else can you do?

    First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).

    Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.

    You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.


Smart SAP Assistant

  • What is the cause and solution for SAP error message 6P428 - From requirements date is greater than to requirements date ?
    The SAP error message 6P428 indicates that there is a discrepancy between the "from requirements date" and the "to requirements date" in a planning or scheduling context. This error typically arises in scenarios involving production planning, material requirements planning (MRP), or similar processes where date ranges are specified for requirements.
    
    Cause: The error occurs when the "from requirements date" is set to a date that is later than the "to requirements date." This creates a logical inconsistency because it implies that requirements are being defined in a backward manner, which is not valid.
    Solution: To resolve this error, you need to ensure that the "from requirements date" is earlier than or equal to the "to requirements date." Here are the steps you can take: Check the Dates: Review the dates specified in the planning or scheduling transaction where the error occurred. Ensure that the "from" date is not later than the "to" date. Adjust the Dates:

    Already have an account? Login here!




Instant HelpGet instant SAP help. Sign up for our Free Essentials Plan.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
The AI Support Assistant is great. It provides comprehensive assistance even on the most difficult issues. I highly recommend this service.
Rate 1
John Jordan
SAP Consultant & Author