Message type: E = Error
Message class: 6P - Messages for planned independent requirements (Appl.area 60)
Message number: 429
Message text: Requirements date indicator smaller than splitting indicator
Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.
To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.
Unfortunately, there isn't any extra information in this error notice.
First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).
Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.
You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.
6P429
- Requirements date indicator smaller than splitting indicator ?The SAP error message 6P429 ("Requirements date indicator smaller than splitting indicator") typically occurs in the context of production planning and material requirements planning (MRP) when there is a mismatch between the requirements date and the splitting indicator settings in the system.
Cause: This error usually arises due to the following reasons: Date Configuration: The requirements date (the date when the material is needed) is set earlier than the splitting indicator date. The splitting indicator is used to determine how the requirements are split across different time periods or production lots. Master Data Issues: There may be inconsistencies in the master data settings for the material, such as the MRP type, lot size, or lead times. Planning Parameters: The planning parameters set in the MRP configuration may not align with the requirements and splitting indicators.
Solution: To resolve this error, you can take the following steps: Check Requirements Date: Review the requirements date for the relevant material and
Get instant SAP help. Sign up for our Free Essentials Plan.
6P428
From requirements date is greater than to requirements date
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
6P427
Item is not suitable for the schedule line (program error)
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
6P430
Material & & does not exist
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
6P431
Reqmts with material number &, version &, plant & already exists
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
Click on this link to search all SAP messages.