Message text: Planned cost distribution on construction measure incomplete
You want to make a rental adjustment due to a constructive measure. You
have two options for specifying how the total costs can be apportioned
to the participating rental units:
Indirectly by entering an apportionment unit (e.g. living area)
Directly by entering costs to the rental units
In this case you have not entered an apportionment unit nor have you
distributed planned costs to all the participating rental units.
The system indicates that there could be an error.
Continue processing if some of the rental units are not to be assigned
planned costs or enter the planned costs for the rental units that
should have some.
Error message extract from SAP system. Copyright SAP SE.
6A555
- Planned cost distribution on construction measure incomplete ?The SAP error message 6A555 ("Planned cost distribution on construction measure incomplete") typically occurs in the context of project system (PS) or construction project management within SAP. This error indicates that there is an issue with the planned cost distribution for a construction measure, which is essential for proper project accounting and reporting.
Cause:
The error can arise due to several reasons, including:
- Incomplete Cost Planning: The planned costs for the construction measure have not been fully defined or distributed across the relevant cost elements.
- Missing Distribution Rules: There may be no distribution rules set up for the planned costs, which means SAP does not know how to allocate costs to different cost centers or internal orders.
- Incorrect Configuration: The configuration settings for the project or construction measure may not be correctly set up, leading to issues in cost distribution.
- Changes in Project Structure: If there have been recent changes to the project structure or cost elements, it may lead to inconsistencies in cost distribution.
Solution:
To resolve the error, you can take the following steps:
Check Cost Planning:
- Go to the project in question and review the cost planning details. Ensure that all planned costs are entered and distributed correctly.
- Use transaction codes like CJ20N (Project Builder) to check the project structure and planned costs.
Review Distribution Rules:
- Ensure that distribution rules for planned costs are defined. You can check this in the project settings or through the relevant configuration settings in SAP.
- Use transaction code CJ40 (Maintain Project Costs) to review and adjust the distribution of planned costs.
Configuration Settings:
- Verify the configuration settings for the project system. Ensure that all necessary settings for cost planning and distribution are correctly configured.
- Consult with your SAP configuration team if you suspect that there are issues with the configuration.
Recalculate Costs:
- If changes have been made to the project structure, you may need to recalculate the costs. Use transaction code CJCP (Recalculate Costs) to refresh the cost distribution.
Consult Documentation:
- Review SAP documentation or help resources for specific guidance on handling cost distribution issues in your version of SAP.
Seek Help from SAP Support:
- If the issue persists after checking the above points, consider reaching out to SAP support for further assistance.
Related Information:
By following these steps, you should be able to identify and resolve the cause of the error message 6A555 in SAP.
Get instant SAP help. Start your 7-day free trial now.
6A554
Enter apportionment unit or maintain planned cost distribution
What causes this issue? You want to carry out a rent adjustment as a result of a construction measure. There are two ways of determining how the tota...
6A553
Actual cost distribution on construction measure incomplete
What causes this issue? You want to carry out a rent adjustment as a result of a construction measure. There are two ways of determining how the tota...
6A560
Condition type &1 does not exist for target object on date &2
What causes this issue? You are trying to copy the amount of the condition item &V1& on date &V2& from a source object to a target ob...
6A561
Condition type &1 created on target object on date &2
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...