Do you have any question about this error?
Message type: E = Error
Message class: 61 - Fehlermeldungen fuer Bedarfsplanung
Message number: 478
Message text: No valid run schedule header exists in this time
You entered a material, a production version and a selection key date.
However, no valid run schedule exists for the selection key date.
The system issues an error message and will not allow you to continue with this transaction until the error is resolved.
Error message extract from SAP system. Copyright SAP SE.
61478
- No valid run schedule header exists in this time ?The SAP error message "61478 No valid run schedule header exists in this time" typically occurs in the context of scheduling jobs or processes in SAP, particularly when dealing with background jobs or process chains. This error indicates that the system cannot find a valid schedule for the job or process you are trying to execute at the specified time.
Causes:
- Missing Schedule Entry: There may not be a scheduled entry for the job or process in the specified time frame.
- Incorrect Time Specification: The time specified for the job may not match any existing schedule.
- Job Deletion or Modification: The job or process schedule may have been deleted or modified, leading to the absence of a valid schedule.
- System Time Issues: There could be discrepancies in system time settings that affect job scheduling.
- Authorization Issues: Lack of proper authorizations to view or execute the scheduled jobs.
Solutions:
- Check Job Scheduling: Verify if the job or process is scheduled correctly. You can do this by navigating to the relevant transaction (e.g., SM37 for background jobs) and checking the job status and schedule.
- Create or Modify Schedule: If no valid schedule exists, create a new schedule for the job or modify the existing one to ensure it aligns with the desired execution time.
- Review Time Settings: Ensure that the system time is set correctly and that there are no discrepancies that could affect job scheduling.
- Check Authorizations: Ensure that you have the necessary authorizations to view and execute the scheduled jobs.
- Consult Logs: Review system logs for any additional error messages or warnings that might provide more context about the issue.
Related Information:
If the problem persists after trying the above solutions, it may be beneficial to consult with your SAP Basis team or reach out to SAP support for further assistance.
Get instant SAP help. Start your 7-day free trial now.
61477
No version entered, sel. ind will be deleted
What causes this issue? You entered th aplnning table by means of a material and you wanted to allocated production version to a quantity. You entere...
61476
Entry & & & missing in T437Z
What causes this issue? Line text &V1& &V2& &V3& has not been defined in Table T437Z.System Response The system issues an er...
61479
No assignment possible
What causes this issue? You have selected a quantity that cannot be assigned. Only quantities that have not yet been assigned can be assigned.System ...
61480
& planned orders cannot be specifically assigned
What causes this issue? You selected the function "Assign complete qty". However, not all the planned orders can be simply assigned.System ...
Click on this link to search all SAP messages.