Do you have any question about this error?
Stop googling SAP errors. Use our Free Essentials plan instead - no credit card needed. Start Now →
Message type: E = Error
Message class: 5P - Error Messages for Schema, Pers.Calc.Rule and Feature Checks
Message number: 216
Message text: &: The operation NEXTR has an invalid sequence number
You have entered an unpermissible number for the NEXTR operation.
Enter a valid number.
Error message extract from SAP system. Copyright SAP SE.
5P216
- &: The operation NEXTR has an invalid sequence number ?The SAP error message 5P216, which states "The operation NEXTR has an invalid sequence number," typically occurs in the context of production planning or order processing within SAP. This error indicates that there is an issue with the sequence of operations defined for a production order or a routing.
Cause:
- Invalid Sequence Number: The operation NEXTR (Next Operation) is expected to follow a specific sequence, and if the sequence number is not defined correctly or is missing, this error can occur.
- Routing Issues: The routing for the production order may have been modified, and the sequence numbers for operations may not align correctly.
- Data Inconsistencies: There may be inconsistencies in the master data, such as the routing or work center definitions.
- Changes in Operations: If operations have been added, deleted, or modified without updating the sequence numbers accordingly, this can lead to the error.
Solution:
- Check Routing: Review the routing for the production order to ensure that all operations have valid sequence numbers. You can do this by navigating to the routing in the SAP system and checking the sequence of operations.
- Adjust Sequence Numbers: If you find any discrepancies in the sequence numbers, adjust them to ensure they are in the correct order. Each operation should have a unique and sequential number.
- Recreate the Order: If the issue persists, consider recreating the production order to ensure that it pulls the correct routing and operation sequences.
- Consult Documentation: Refer to SAP documentation or help files for specific guidance on routing and operation sequences.
- Check for Updates: Ensure that your SAP system is up to date, as some errors may be resolved in newer patches or updates.
Related Information:
CA03
(Display Routing) or CO03
(Display Production Order) to check the routing and order details.If the problem continues after following these steps, it may be beneficial to consult with your SAP support team or a technical consultant who can provide deeper insights into the issue.
Get instant SAP help. Sign up for our Free Essentials Plan.
5P215
&: The comma is missing at the end of the BREAK or feature operation
What causes this issue? The operation BREAK and feature operations must end with a comma (',').How to fix this error? Place a comma after ...
5P214
&: The '=' sign is missing after FLDID or feature operation
What causes this issue? The '=' is missing after the operation FLDID or the feature operation.How to fix this error? Check the syntax of t...
5P217
&: No line exists with the sequence number determined by NEXTR
What causes this issue? You have used the NEXTR operation and written a number or letter behind it. This means that a line must follow the operation....
5P218
&: Sequence no. is not within the set of values: '9' is the last number
What causes this issue? You have used the NEXTR operation and would like to move to a new line. The number in the line containing the NEXTR operation...
Click on this link to search all SAP messages.