Do you have any question about this error?
Message type: E = Error
Message class: 5G - HR: Messages for Britain
Message number: 373
Message text: The Intended leave start cannot be after the end of the APP
Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.
To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.
Unfortunately, there isn't any extra information in this error notice.
First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).
Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.
You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.
5G373
- The Intended leave start cannot be after the end of the APP ?The SAP error message 5G373 indicates that there is an issue with the planned leave dates in relation to the end of the Absence Planning Period (APP). Specifically, the error states that the intended leave start date cannot be after the end of the APP. This typically occurs in the context of managing employee absences, such as vacation or sick leave, within the SAP system.
Cause:
- Incorrect Date Entry: The start date of the leave request is entered after the end date of the Absence Planning Period.
- Absence Planning Period Configuration: The APP may be configured incorrectly, or the dates may not align with the employee's leave request.
- System Settings: There may be system settings or configurations that restrict leave requests to fall within a specific planning period.
Solution:
- Check Leave Dates: Review the leave request and ensure that the start date is before or on the same day as the end date of the APP.
- Review APP Configuration: Check the configuration of the Absence Planning Period in the system. Ensure that it is set up correctly and that the dates are appropriate for the employee's leave requests.
- Adjust Leave Request: If the leave request is indeed outside the APP, adjust the dates to fall within the allowed range.
- Consult HR or System Administrator: If you are unsure about the APP settings or how to adjust the leave request, consult with your HR department or the SAP system administrator for assistance.
Related Information:
By addressing the above points, you should be able to resolve the error message 5G373 and successfully process the leave request.
Get instant SAP help. Start your 7-day free trial now.
5G372
Intended start date cannot be before &, 20 week after the start of APP
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
5G371
If partner is dead,intended leave start cannot be before the start of APP
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
5G374
If mother is dead,intended leave start cannot be before the start of MPP
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
5G375
Intended start date cannot be before &, 20 week after the start of MPP
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
Click on this link to search all SAP messages.