How To Fix 5E110 - IT entity change date posterior to confirmation report


5E110 - Overview

  • Message type: E = Error

  • Message class: 5E - Error messages for Spanish infotypes module pools

  • Message number: 110

  • Message text: IT entity change date posterior to confirmation report

  • Show details Hide details


  • Self-Explanatory Message

    Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.

    To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.

    Unfortunately, there isn't any extra information in this error notice.



    What else can you do?

    First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).

    Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.

    You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.


Smart SAP Assistant

  • What is the cause and solution for SAP error message 5E110 - IT entity change date posterior to confirmation report ?
    The SAP error message 5E110 indicates that there is a discrepancy between the change date of an IT (Information Technology) entity and the date of a confirmation report. This typically occurs in the context of project management or asset management within SAP, where changes to an entity (like a project or asset) cannot be processed because the change date is later than the date of the confirmation report.
    
    Cause: The error is usually caused by one of the following scenarios: Date Mismatch: The change date of the IT entity (e.g., a project or asset) is set to a date that is after the date of the confirmation report. This can happen if changes are made to the entity after the confirmation report has been generated. Data Entry Error: There may have been an error in data entry, where the dates were not correctly aligned. System Configuration: There might be configuration settings in the SAP system

    Already have an account? Login here!




Instant HelpGet instant SAP help. Sign up for our Free Essentials Plan.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
ERPlingo's SAP support assistant is amazing. Saves me countless hours trying to solve complex SAP issues myself. It's a real game changer!
Rate 1
Thomas Michael
SAP Consultant, Author & Speaker