How To Fix 53819 - Prod. or setup time?


SAP Error Message - Details

  • Message type: E = Error

  • Message class: 53 - Incentive Wages Data

  • Message number: 819

  • Message text: Prod. or setup time?

  • Show details Hide details


  • Self-Explanatory Message

    Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.

    To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.

    Unfortunately, there isn't any extra information in this error notice.



    What else can you do?

    First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).

    Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.

    You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.


Smart SAP Assistant

  • What is the cause and solution for SAP error message 53819 - Prod. or setup time? ?

    The SAP error message 53819 typically relates to issues with production or setup times in the context of production planning and scheduling. This error can occur in various scenarios, such as when trying to create or modify production orders, or when scheduling operations in a manufacturing environment.

    Cause:

    The error message 53819 usually indicates that there is a problem with the production or setup time defined for a particular operation or resource. Common causes include:

    1. Incorrect Time Settings: The production or setup times may not be correctly defined in the material master or routing.
    2. Missing Data: Required data for the production process, such as work center details or operation times, may be missing or incomplete.
    3. Configuration Issues: There may be configuration issues in the production planning module that affect how times are calculated or applied.
    4. Capacity Constraints: If the work center is overloaded or has capacity constraints, it may lead to issues with scheduling.

    Solution:

    To resolve the error message 53819, you can take the following steps:

    1. Check Material Master Data:

      • Go to the material master record and verify that the production and setup times are correctly defined.
      • Ensure that the relevant views (e.g., MRP, Work Scheduling) are properly maintained.
    2. Review Routing:

      • Check the routing associated with the production order to ensure that all operations have valid setup and production times defined.
      • Make sure that the routing is correctly assigned to the material.
    3. Examine Work Center Settings:

      • Review the work center settings to ensure that the production and setup times are correctly configured.
      • Check for any capacity constraints or overloads that may affect scheduling.
    4. Adjust Production Order:

      • If the error occurs while creating or modifying a production order, try adjusting the order parameters or re-entering the order to see if the issue persists.
    5. Consult SAP Notes:

      • Check the SAP Support Portal for any relevant notes or patches that may address this specific error message.
    6. Testing:

      • After making changes, test the process again to ensure that the error has been resolved.

    Related Information:

    • Transaction Codes: You may use transaction codes like MM02 (Change Material), CA01 (Create Routing), and CR01 (Create Work Center) to access and modify the relevant data.
    • SAP Documentation: Refer to SAP Help documentation for detailed information on production planning and scheduling.
    • User Forums: Consider checking SAP community forums or user groups for discussions related to this error, as other users may have encountered and resolved similar issues.

    If the problem persists after following these steps, it may be beneficial to consult with your SAP support team or a consultant who specializes in SAP production planning.

    • Do you have any question about this error?


      Upgrade now to chat with this error.


Instant HelpGet instant SAP help. Start your 7-day free trial now.


Related SAP Error Messages

Click the links below to see the following related messages:
  • 53818 Start of prd. and/or setup time missing
    Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...

  • 53817 Machine time already running
    Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...

  • 53820 No clock-out entry
    Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...

  • 53821 No clock-in time
    Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...

Click on this link to search all SAP messages.


Rating
The AI Support Assistant is great. It provides comprehensive assistance even on the most difficult issues. I highly recommend this service.
Rate 1
John Jordan
SAP Consultant & Author