Message type: E = Error
Message class: 40 - Messages for Process Orders
Message number: 594
Message text: Check either duration or start/finish date
You have tried to check the duration and the start/finish date.
The system issues an error message and will not allow you to continue with this transaction until the error is resolved.
Check either the duration or the start/finish date.
Error message extract from SAP system. Copyright SAP SE.
40594
- Check either duration or start/finish date ?The SAP error message 40594, which states "Check either duration or start/finish date," typically occurs in the context of project management or scheduling within SAP, particularly in modules like Project System (PS) or Production Planning (PP). This error indicates that there is an inconsistency in the scheduling parameters of a task or project.
Cause:
The error can arise due to several reasons:
- Inconsistent Dates: The start and finish dates of a task may not align with the specified duration. For example, if the duration is set to 5 days, but the finish date is set to a date that is not 5 days after the start date, this inconsistency will trigger the error.
- Missing Data: Either the duration or the start/finish date may not be filled in, leading to an inability for the system to calculate the other parameter.
- Incorrect Time Units: The duration might be specified in a unit that does not match the expected format (e.g., hours instead of days).
- Project Structure Issues: If the project structure is not correctly defined, it may lead to scheduling conflicts.
Solution:
To resolve the error, you can take the following steps:
- Check Dates and Duration: Review the start date, finish date, and duration of the task or project. Ensure that they are consistent with each other. Adjust the dates or duration as necessary.
- Fill in Missing Information: If either the duration or the start/finish date is missing, provide the necessary information.
- Validate Time Units: Ensure that the duration is specified in the correct time unit that the system expects.
- Review Project Structure: If applicable, check the overall project structure for any inconsistencies that might affect scheduling.
- Use Scheduling Functions: Utilize SAP's scheduling functions to automatically calculate and adjust dates and durations based on the project requirements.
Related Information:
CJ20N
(Project Builder) or CJI3
(Project Actual Line Items) to access and modify project details.If the issue persists after following these steps, it may be beneficial to consult with your SAP support team or a functional consultant who specializes in the relevant SAP module.
Get instant SAP help. Start your 7-day free trial now.
40593
The syntax check log is empty
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
40592
Automatic value assignment not possible for characteristic & &
What causes this issue? You tried to automatically assign values to a characteristic. For this characteristic automatic value assignment is only poss...
40595
You cannot create further batches
What causes this issue? For the following reason, you can no longer create a batch for this order: For the order, an inspection lot has been created ...
40596
Number of send operations must be > 1 for specified period of time
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
Click on this link to search all SAP messages.