How To Fix 40270 - Secondary resource number & has already been assigned


SAP Error Message - Details

  • Message type: E = Error

  • Message class: 40 - Messages for Process Orders

  • Message number: 270

  • Message text: Secondary resource number & has already been assigned

  • Show details Hide details
  • What causes this issue?

    You entered a secondary resource number that is already being used.

    The system issues an error message and will not allow you to continue with this transaction until the error is resolved.

    System Response

    How to fix this error?

    Enter a secondary resource number that has not been allocated yet.

    Error message extract from SAP system. Copyright SAP SE.


Smart SAP Assistant

  • What is the cause and solution for SAP error message 40270 - Secondary resource number & has already been assigned ?

    The SAP error message "40270 Secondary resource number & has already been assigned" typically occurs in the context of production planning or scheduling when you are trying to assign a secondary resource (like a machine or tool) to a production order or operation, but that resource is already assigned to another operation or order.

    Cause:

    1. Resource Already Assigned: The primary cause of this error is that the secondary resource you are trying to assign is already in use or assigned to another operation or production order.
    2. Scheduling Conflicts: There may be scheduling conflicts where the resource is not available for the time slot you are trying to assign it to.
    3. Configuration Issues: There could be configuration settings in the system that restrict the assignment of resources.

    Solution:

    1. Check Resource Availability: Verify if the secondary resource is indeed assigned to another operation. You can do this by checking the resource's schedule or availability in the system.
    2. Reassign or Release Resource: If the resource is assigned to another operation that can be rescheduled, consider releasing it or reassigning it to free it up for your current operation.
    3. Adjust Scheduling: If the resource is needed for multiple operations, you may need to adjust the scheduling of the operations to avoid conflicts.
    4. Review Configuration: Check the configuration settings related to resource assignment in your SAP system. Ensure that there are no restrictions that prevent the assignment of the secondary resource.
    5. Consult Documentation: Refer to SAP documentation or help resources for specific guidelines on managing resource assignments and resolving conflicts.

    Related Information:

    • Transaction Codes: You may use transaction codes like CO02 (Change Production Order) or CO03 (Display Production Order) to view and manage production orders and their assigned resources.
    • Resource Planning: Familiarize yourself with resource planning and scheduling concepts in SAP, as understanding these can help prevent such errors in the future.
    • SAP Notes: Check for any relevant SAP Notes that might address this specific error or provide additional troubleshooting steps.

    If the issue persists after trying the above solutions, it may be beneficial to consult with your SAP support team or a functional consultant who specializes in production planning and scheduling.

    • Do you have any question about this error?


      Upgrade now to chat with this error.


Instant HelpGet instant SAP help. Start your 7-day free trial now.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
ERPlingo simplifies finding the accurate answers to SAP message errors. I now use every week. A must have tool for anyone working with SAP! Highly recommended!
Rate 1
Kent Bettisworth
Executive SAP Consultant