Do you have any question about this error?
Message type: E = Error
Message class: 40 - Messages for Process Orders
Message number: 049
Message text: No resource was found for operation &1
You want to select a resource.
The system could not find a resource that met the selection criteria,
is allocated to the resource network, and is permitted after
release (task list usage).
The system issues an error message and will not allow you to continue with this transaction until the error is resolved.
Check the selection criteria in the master recipe, resource
classification, the resource network, and the task list usage key
(resource basic data).
Error message extract from SAP system. Copyright SAP SE.
40049
- No resource was found for operation &1 ?The SAP error message "40049 No resource was found for operation &1" typically indicates that the system is unable to find a specific resource (such as a material, work center, or operation) that is required for a particular operation in a process, such as production planning or order processing.
Cause:
- Missing Resource: The resource specified in the operation (denoted by &1) does not exist in the system. This could be due to incorrect data entry or the resource not being created in the system.
- Incorrect Configuration: The configuration settings for the operation may not be set up correctly, leading to the system being unable to locate the required resource.
- Data Inconsistency: There may be inconsistencies in the master data, such as the resource being marked as inactive or deleted.
- Authorization Issues: The user may not have the necessary authorizations to access the resource.
Solution:
- Check Resource Existence: Verify that the resource (e.g., material, work center) exists in the system. You can do this by checking the relevant master data transactions (e.g., MM03 for materials, CR02 for work centers).
- Review Operation Configuration: Ensure that the operation is correctly configured and that it references the correct resource. This may involve checking the routing or production order settings.
- Data Consistency Check: Run consistency checks on the master data to identify any discrepancies. You may need to reactivate or recreate the resource if it has been marked inactive or deleted.
- Authorization Check: Ensure that the user has the necessary authorizations to access the resource. This may involve checking user roles and permissions in the system.
- Consult Documentation: Refer to SAP documentation or help resources for specific guidance related to the error message and the context in which it occurs.
Related Information:
By following these steps, you should be able to identify the cause of the error and implement a solution to resolve it.
Get instant SAP help. Start your 7-day free trial now.
40048
Resource & is only permitted until release
What causes this issue? The resource can only be used for planning purposes.System Response The system does not release the process order.How to fix...
40047
Inspection lot not found for process instructions of type '5'
What causes this issue? You want to generate a PI sheet from the process order. The process order features process instructions type '5' th...
40050
You cannot select resources for phase &
What causes this issue? You want to select resources for a phase. As the resource of a phase is specified by the superior operation, you can only use...
40051
Select a resource
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...