How To Fix 3Q025 - Transferred plan cannot begin before start date of existing plan (&)


3Q025 - Overview

  • Message type: E = Error

  • Message class: 3Q - HR : Messages for Hong Kong

  • Message number: 025

  • Message text: Transferred plan cannot begin before start date of existing plan (&)

  • Show details Hide details


  • Self-Explanatory Message

    Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.

    To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.

    Unfortunately, there isn't any extra information in this error notice.



    What else can you do?

    First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).

    Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.

    You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.


Smart SAP Assistant

  • What is the cause and solution for SAP error message 3Q025 - Transferred plan cannot begin before start date of existing plan (&) ?
    The SAP error message 3Q025 indicates that there is a conflict with the scheduling of a transferred plan. Specifically, it means that the transferred plan you are trying to create or modify cannot start before the start date of an existing plan. This typically occurs in the context of project management or production planning within SAP.
    
    Cause: Date Conflict: The start date of the new plan (or transferred plan) is set earlier than the start date of an existing plan. This can happen if the new plan is intended to overlap with an existing plan that has already been scheduled. Incorrect Data Entry: There may be a mistake in the data entry where the dates have been incorrectly set. System Configuration: There might be configuration settings in the system that enforce strict scheduling rules, preventing overlapping plans.
    Solution: Check Dates: Review the start dates of both the existing plan and the new plan. Ensure that the

    Already have an account? Login here!




Instant HelpGet instant SAP help. Sign up for our Free Essentials Plan.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
ERPlingo simplifies finding the accurate answers to SAP message errors. I now use every week. A must have tool for anyone working with SAP! Highly recommended!
Rate 1
Kent Bettisworth
Executive SAP Consultant