How To Fix 3F794 - Budget falls short of required amount/quantity


SAP Error Message - Details

  • Message type: E = Error

  • Message class: 3F - Compensation Management

  • Message number: 794

  • Message text: Budget falls short of required amount/quantity

  • Show details Hide details
  • What causes this issue?

    You have assigned a budget value to a budget unit, that does not cover
    the subordinate budgets. As a result, your budget structure is
    inconsistent and can, therefore, not be released.

    System Response

    The system issues an error message and will not allow you to continue with this transaction until the error is resolved.

    WHAT_TO_DO&
    Your budgets must be consistent, to do this, modify the budget values
    accordingly.

    Error message extract from SAP system. Copyright SAP SE.


Smart SAP Assistant

  • What is the cause and solution for SAP error message 3F794 - Budget falls short of required amount/quantity ?

    The SAP error message 3F794 indicates that there is a budget shortfall for a particular cost center, internal order, or project. This error typically occurs when you attempt to post a transaction that exceeds the available budget for the specified period or project.

    Cause:

    1. Budget Limit Exceeded: The most common cause is that the transaction amount exceeds the available budget for the specified cost center or internal order.
    2. Incorrect Budgeting: The budget may not have been properly allocated or may not have been updated to reflect recent changes.
    3. Period Restrictions: The budget may be restricted to a specific period, and the transaction is being posted outside of that period.
    4. Budget Type: The budget type may not allow for the transaction being attempted (e.g., if it is a commitment or actuals).
    5. Configuration Issues: There may be configuration issues in the budget control settings.

    Solution:

    1. Check Available Budget: Review the budget for the relevant cost center or internal order to ensure that there is sufficient budget available for the transaction.
    2. Adjust Budget: If necessary, increase the budget allocation for the relevant cost center or internal order. This can be done through the budget planning transaction (e.g., using transaction codes like KP06 for cost centers).
    3. Review Transaction Details: Ensure that the transaction details (amount, cost center, internal order) are correct and that you are posting to the correct period.
    4. Consult with Finance Team: If you are unsure about budget allocations or need to make changes, consult with your finance or controlling team for guidance.
    5. Check Configuration: If the issue persists, check the configuration settings for budget control in SAP to ensure they are set up correctly.

    Related Information:

    • Transaction Codes: Familiarize yourself with relevant transaction codes such as:
      • KP06: Change Plan Data for Cost Centers
      • KSB1: Cost Centers: Actual Line Items
      • S_ALR_87013611: Budget/Actual/Commitment Report
    • Budget Control Settings: Understand the budget control settings in your SAP system, which can be found in the configuration under Controlling (CO).
    • Documentation: Refer to SAP documentation or help files for detailed instructions on budget management and error resolution.

    By following these steps, you should be able to identify the cause of the error and take appropriate action to resolve it.

    • Do you have any question about this error?


      Upgrade now to chat with this error.


Instant HelpGet instant SAP help. Start your 7-day free trial now.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
The AI Support Assistant is great. It provides comprehensive assistance even on the most difficult issues. I highly recommend this service.
Rate 1
John Jordan
SAP Consultant & Author