Do you have any question about this error?
Message type: E = Error
Message class: 29 - Bills of Material
Message number: 082
Message text: BOM status does not allow allocation to operations
You want to allocate a material component to an operation in a routing.
This is only possible if the BOM has a status for which the indicator
<LS>Released for work scheduling</> is set in Customizing (BOM status).
The BOM you are editing does not have a status with this indicator.
You cannot allocate the material component to a routing until:
the BOM is given a status with the indicator <LS>Released for work
scheduling</>
the settings in Customizing (BOM status) are changed to include this
indicator for the selected status
Error message extract from SAP system. Copyright SAP SE.
29082
- BOM status does not allow allocation to operations ?The SAP error message 29082, which states "BOM status does not allow allocation to operations," typically occurs in the context of production planning and execution. This error indicates that the Bill of Materials (BOM) associated with a production order or operation has a status that prevents it from being used for allocation to operations. Here are the potential causes, solutions, and related information for this error:
Causes:
- BOM Status: The BOM may be set to a status that does not allow it to be used for production. This could be due to it being marked as obsolete or inactive.
- BOM Validity Dates: The BOM may have validity dates that do not encompass the date of the production order or operation.
- BOM Changes: Recent changes to the BOM may not have been saved or activated properly, leading to inconsistencies.
- Plant-Specific BOM: If the BOM is plant-specific, it may not be available for the plant where the production order is being processed.
- Authorization Issues: The user may not have the necessary authorizations to access or use the BOM.
Solutions:
- Check BOM Status: Go to the BOM transaction (CS03) and check the status of the BOM. Ensure that it is active and not marked as obsolete.
- Review Validity Dates: Verify the validity dates of the BOM to ensure they cover the date of the production order. If necessary, update the validity dates.
- Activate Changes: If there have been recent changes to the BOM, ensure that they have been saved and activated properly.
- Plant-Specific BOM: If the BOM is plant-specific, ensure that the correct BOM is being used for the relevant plant. You may need to create or adjust the BOM for the specific plant.
- Check Authorizations: Ensure that the user has the necessary authorizations to access and use the BOM. This may involve checking user roles and permissions in the SAP system.
Related Information:
If the issue persists after checking these aspects, it may be beneficial to consult with your SAP support team or refer to SAP's support resources for further assistance.
Get instant SAP help. Start your 7-day free trial now.
29081
No selected items valid on & - no allocation to operation possible
What causes this issue? You want to change items on the <LS>valid-from</> date. You either entered this date directly on the initial scre...
29080
Selected item(s) not valid on & - no operation allocation possible
What causes this issue? You want to change the item(s) on the <LS>valid-from</> date. You either entered this date directly on the initia...
29083
Status & is not released for routings
What causes this issue? You want to allocate a material component to the selected operation. This is only possible if the BOM has a status for which ...
29084
Item cannot be displayed
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
Click on this link to search all SAP messages.