Do you have any question about this error?
Message type: E = Error
Message class: 29 - Bills of Material
Message number: 080
Message text: Selected item(s) not valid on & - no operation allocation possible
You want to change the item(s) on the <LS>valid-from</> date.
You either entered this date directly on the initial screen in the
field <LS>Valid from</>, or the system determined the date from the
change number you entered on the initial screen.
As the selected item(s) is/are not valid on &V1&, you cannot change the
item(s) on this date, and therefore cannot create an allocation to an
operation.
You have to make any changes to an item within the validity period of
the item, which is defined by the fields <LS>Valid from</> and
<LS>Valid to</> or the <LS>change number</> on the item overview.
If you want to allocate the item(s) to an operation, make the change
within the validity period of the item(s).
There are two ways of doing this:
If the BOM has not yet been changed with history (with reference to a
change number), choose the valid-from date of the item(s) as the
<LS>valid-from</> date on the initial screen.
If the BOM has already been changed with history, make the change with
reference to a change number.
Choose a change number with a valid-from date which lies within the
validity period of the item(s): the selected item(s) may already have
been changed or entered with reference to a change number.
Error message extract from SAP system. Copyright SAP SE.
29080
- Selected item(s) not valid on & - no operation allocation possible ?The SAP error message "29080 Selected item(s) not valid on & - no operation allocation possible" typically occurs in the context of production planning or order processing. This error indicates that the selected item(s) cannot be processed for the specified operation, often due to issues related to the configuration of the production order, material availability, or the status of the operation.
Causes:
- Invalid Item Selection: The item you are trying to allocate may not be valid for the operation you are working with.
- Status Issues: The operation or order may be in a status that does not allow for allocation (e.g., completed, closed, or not released).
- Material Availability: The required materials for the operation may not be available in the required quantity.
- Routing Issues: The routing for the production order may not be correctly defined, or the operation may not be linked to the correct material.
- Capacity Constraints: There may be capacity constraints in the work center that prevent the allocation of the operation.
Solutions:
- Check Item Validity: Ensure that the selected item is valid for the operation you are trying to allocate. Verify the item number and its configuration.
- Review Order Status: Check the status of the production order and ensure it is in a state that allows for allocation (e.g., it should be released).
- Material Check: Verify that all required materials are available in the necessary quantities. You can check the stock levels and availability using transaction codes like MB52 or MD04.
- Routing Verification: Ensure that the routing for the production order is correctly defined and that the operation is linked to the correct material.
- Capacity Planning: Check the capacity of the work center to ensure that it can handle the operation. You may need to adjust the capacity or reschedule the operation.
- Consult Documentation: Review SAP documentation or help files related to production orders and operations for additional guidance.
Related Information:
If the issue persists after checking these areas, it may be beneficial to consult with your SAP support team or a functional consultant who specializes in production planning.
Get instant SAP help. Start your 7-day free trial now.
29079
No configurable material exists for material &1
What causes this issue? You want to distribute a <DS:GLOS.3526BF08AFAB52B9E10000009B38F974>material variant</> via ALE. However, there is...
29078
Material & is configurable
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
29081
No selected items valid on & - no allocation to operation possible
What causes this issue? You want to change items on the <LS>valid-from</> date. You either entered this date directly on the initial scre...
29082
BOM status does not allow allocation to operations
What causes this issue? You want to allocate a material component to an operation in a routing. This is only possible if the BOM has a status for whi...
Click on this link to search all SAP messages.