How To Fix 1G292 - &1 &2: End date of period &3 >= go-live date &4


1G292 - Overview

  • Message type: E = Error

  • Message class: 1G - BKK: Konditionen

  • Message number: 292

  • Message text: &1 &2: End date of period &3 >= go-live date &4

  • Show details Hide details


  • Self-Explanatory Message

    Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.

    To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.

    Unfortunately, there isn't any extra information in this error notice.



    What else can you do?

    First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).

    Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.

    You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.


Smart SAP Assistant

  • What is the cause and solution for SAP error message 1G292 - &1 &2: End date of period &3 >= go-live date &4 ?
    The SAP error message 1G292 indicates that there is a conflict between the end date of a specified period and the go-live date of a project or system. Specifically, the error message states that the end date of the period (&3) is greater than or equal to the go-live date (&4). This typically occurs in the context of project management, financial planning, or system configuration where time periods are defined.
    
    Cause: Incorrect Date Configuration: The end date of a financial period or project phase has been set incorrectly, overlapping or extending beyond the go-live date. Data Entry Error: There may have been a mistake during data entry, leading to an incorrect end date being specified. Project Timeline Issues: The project timeline may not have been properly aligned with the go-live date, causing discrepancies.
    Solution: Review Period Dates: Check the configuration of the period in question. Ensure that the end date of the period is set to

    Already have an account? Login here!




Instant HelpGet instant SAP help. Sign up for our Free Essentials Plan.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
The AI Support Assistant is great. It provides comprehensive assistance even on the most difficult issues. I highly recommend this service.
Rate 1
John Jordan
SAP Consultant & Author