How To Fix 1G284 - &1 &2: Next date &3 is before the last period end &4


SAP Error Message - Details

  • Message type: E = Error

  • Message class: 1G - BKK: Konditionen

  • Message number: 284

  • Message text: &1 &2: Next date &3 is before the last period end &4

  • Show details Hide details


  • Self-Explanatory Message

    Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.

    To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.

    Unfortunately, there isn't any extra information in this error notice.



    What else can you do?

    First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).

    Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.

    You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.


Smart SAP Assistant

  • What is the cause and solution for SAP error message 1G284 - &1 &2: Next date &3 is before the last period end &4 ?

    The SAP error message 1G284 indicates that there is a date inconsistency in the scheduling of a recurring task or process. Specifically, the message states that the "Next date" for a scheduled task is set to a date that is earlier than the "Last period end" date. This typically occurs in scenarios involving periodic processing, such as billing, maintenance plans, or other scheduled activities.

    Cause:

    The error is caused by the following:

    • The next execution date for a scheduled task is incorrectly set to a date that precedes the last completed period's end date.
    • This can happen due to manual entry errors, incorrect configuration of the scheduling parameters, or issues with the underlying data.

    Solution:

    To resolve this error, you can take the following steps:

    1. Check the Scheduling Parameters:

      • Navigate to the relevant transaction or configuration where the scheduling is defined (e.g., maintenance plans, billing plans).
      • Verify the "Next date" and "Last period end" dates to ensure they are logically consistent.
    2. Adjust the Next Date:

      • If the "Next date" is indeed set incorrectly, update it to a date that is after the "Last period end" date.
      • Ensure that the new date aligns with the intended schedule for the task.
    3. Review Configuration Settings:

      • Check the configuration settings for the scheduling process to ensure that they are set up correctly.
      • Look for any rules or parameters that might affect the scheduling logic.
    4. Consult Documentation:

      • Refer to SAP documentation or help resources for specific guidance related to the module you are working with (e.g., PM, SD, etc.).
    5. Test the Changes:

      • After making adjustments, test the scheduling process to ensure that it now works without errors.
    6. Seek Help from SAP Support:

      • If the issue persists or if you are unsure about making changes, consider reaching out to SAP support or your internal SAP team for assistance.

    Related Information:

    • Transaction Codes: Depending on the context, you may need to use specific transaction codes to access the relevant configuration or data (e.g., IP10 for maintenance plans, VF01 for billing).
    • SAP Notes: Check for any SAP Notes related to this error message for additional insights or patches that may address the issue.
    • User Forums: Consider visiting SAP community forums or user groups where similar issues may have been discussed.

    By following these steps, you should be able to resolve the error message 1G284 and ensure that your scheduling is set up correctly.

    • Do you have any question about this error?


      Upgrade now to chat with this error.


Instant HelpGet instant SAP help. Start your 7-day free trial now.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
The AI Support Assistant is great. It provides comprehensive assistance even on the most difficult issues. I highly recommend this service.
Rate 1
John Jordan
SAP Consultant & Author