Do you have any question about this error?
Message type: E = Error
Message class: 12 - Herstelldatum/Mindesthaltbarkeitsdatum/Chargen
Message number: 013
Message text: Reference date (&1) must not be before date of production (&2)
Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.
To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.
Unfortunately, there isn't any extra information in this error notice.
First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).
Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.
You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.
12013
- Reference date (&1) must not be before date of production (&2) ?The SAP error message 12013, which states "Reference date (&1) must not be before date of production (&2)," typically occurs in the context of production planning or inventory management. This error indicates that the reference date you are trying to use is earlier than the date of production for the material or item in question.
Cause:
- Incorrect Date Entry: The reference date you are entering is earlier than the production date of the material.
- Data Integrity Issues: There may be inconsistencies in the data where the production date is not correctly updated or recorded.
- System Configuration: The system may have specific settings that enforce date constraints based on business rules.
Solution:
- Check Dates: Verify the reference date you are entering. Ensure that it is not earlier than the production date. You can do this by checking the production order or the material master data.
- Update Reference Date: If the reference date is indeed incorrect, update it to a date that is on or after the production date.
- Review Production Data: Check the production order or the relevant transaction to ensure that the production date is correctly set and reflects the actual production timeline.
- Consult Documentation: If you are unsure about the correct dates to use, refer to your organization's documentation or consult with a colleague who is familiar with the production process.
- System Configuration: If the issue persists and you believe the dates should be valid, consult with your SAP administrator or technical team to review the system configuration and any custom validations that may be in place.
Related Information:
By following these steps, you should be able to resolve the error and proceed with your SAP transactions.
Get instant SAP help. Start your 7-day free trial now.
12012
Date of production differs from that of other items in batch
What causes this issue? The current item contains production date &V2&. However, at least one other item for batch &V1& has a differe...
12011
Date of production/SLED differs from that of other items in batch
What causes this issue? The current item contains production date &V2& and shelf life expiration date (SLED) &V3&. However, at least ...
12014
SLED in current item differs from that of other items in batch
What causes this issue? The current item has shelf life expiration date (SLED) &V2&. However, at least one other item for batch &V1& ...
12015
SLED copied as default value from batch &1 - please check
What causes this issue? The batch <LS>&V1&</> entered in the item currently being moved already exists. The shelf life expiration...