Do you have any question about this error?
Message type: E = Error
Message class: KV - Variance Analysis for Cost Centers and Cost Objects
Message number: 170
Message text: Kalkulation nicht vorhanden. Material/Werk/Fvers/Kalk.Var./Datum: & & & &
You are using a function that calculates target costs using the
preliminary cost estimate for the product cost collector (meaning on the
basis of planned costs). On the basis of this information, the system
can:
Calculate work in process (WIP)
Calculate the value of the unplanned scrap in variance calculation
Calculate production variances and display them subdivided into variance
categories
For material &v2&
No repetitive manufacturing profile has been maintained in the material
master record
No product cost collector for production version&v3& has been created
In the product cost collector you have
Not specified a production version
Not specified a costing variant for preliminary costing
The cost estimate for material &v2& is
Missing
Was not created with costing variant &v1&
Was not created with production version &v3& or was not linked to it
Not valid on &v4&
Not saved as an itemization
Not valid at the time WIP or variances were calculated
Work in process and variances for product cost collectors are calculated
separately in each period. The cost estimate must be valid on the last
day of the period.
If target costs are calculated directly in a report, the cost estimate
must be valid on the last day of the reporting timeframe.
The absence of target costs has the following effects:
The system cannot display a report on the target costs
The system cannot valuate the work in process
The system cannot valuate the scrap
In variance calculation, the system cannot split the difference between
the target costs and the actual costs into variance categories.
The difference is updated as a remaining variance.
For the valuation of work in process and scrap at target costs
calculated on the basis of planned costs, check the <LS>valuation
variant for work in process and scrap</>.
Proceed as follows:
Check the validity dates of the cost estimate.
<DS:TRAN.CK13N>Proceed</>
Create a new cost estimate for the material, and save the cost estimate
in itemized form by turning on the <LS>Itemization</> field in the <LS>
Update parameters</> dialog box.
<DS:TRAN.MF30>Proceed</>
Calculate the WIP or variances again.
If you are working in reporting, select a report that does not refer to
the target costs.
Fehlermeldungsextrakt aus SAP-System. Copyright SAP SE
KV170
- Kalkulation nicht vorhanden. Material/Werk/Fvers/Kalk.Var./Datum: & & & & ?Get instant SAP help. Start your 7-day free trial now.
KV169
Keine Sollkosten, da kein Preis für Material & & in Währung & ermittelbar
Was verursacht dieses Problem? Because the company code currency is not the same as the controlling area currency, the system is attempting to calc...
KV168
Keine Arbeitsvorgänge gefunden
Was verursacht dieses Problem? An internal system error occurred.Systemantwort Das System gibt eine Fehlermeldung aus und erlaubt Ihnen nicht, mi...
KV171
Kalkulation nicht vorhanden. Material/Werk/KVers/Kalk.Var./Datum: & & & &
Was verursacht dieses Problem? The system is attempting to calculate target costs for the following purposes: To valuate work in process To valuate...
KV172
Kalkulation zum Kundenauftrag & & nicht vorhanden
Was verursacht dieses Problem? The system is attempting to determine the target costs on the basis of a sales order cost estimate. If you are using...
Klicken Sie auf diesen Link, um alle SAP-Meldungen durchsuchen.