Do you have any question about this error?
Message type: E = Error
Message class: KV - Variance Analysis for Cost Centers and Cost Objects
Message number: 171
Message text: Kalkulation nicht vorhanden. Material/Werk/KVers/Kalk.Var./Datum: & & & &
The system is attempting to calculate target costs for the following
purposes:
To valuate work in process
To valuate unplanned scrap in variance calculation
To be able to assign the variances to variance categories
No target costs can be calculated because the cost estimate used in
target cost calculation could not be found. Possible reasons:
The cost estimate does not exist.
The cost estimate is not in the relevant costing variant.
The cost estimate not valid
Work in process and variances for product cost collectors are calculated
separately in each period. The cost estimate must be valid on the last
day of the period.
The cost estimate was not saved as an itemization.
Note that you can only valuate work in process and scrap at target costs
using a product cost estimate with quantity structure. A unit cost
estimate cannot be used to valuate work in process and scrap.
The system cannot execute the required function.
Check the appropriate data depending on the selected function:
The target cost versions
The <LS>valuation variant for work in process and scrap</>
Check whether the cost estimate relevant for target cost calculation
exists. For information on the existing cost estimates, see the <LS>
Product Cost Controlling Information System</>.
Check the validity dates of the cost estimate.
<DS:TRAN.CK13N>Proceed</>
Create a new cost estimate for the material, and save the cost estimate
in itemized form by turning on the <LS>Itemization</> field in the <LS>
Update parameters</> dialog box.
<DS:TRAN.MF30>Proceed</>
Calculate the WIP or variances again.
If you are working in reporting, select a report that does not refer to
the target costs.
Fehlermeldungsextrakt aus SAP-System. Copyright SAP SE
KV171
- Kalkulation nicht vorhanden. Material/Werk/KVers/Kalk.Var./Datum: & & & & ?Get instant SAP help. Start your 7-day free trial now.
KV170
Kalkulation nicht vorhanden. Material/Werk/Fvers/Kalk.Var./Datum: & & & &
Was verursacht dieses Problem? You are using a function that calculates target costs using the preliminary cost estimate for the product cost colle...
KV169
Keine Sollkosten, da kein Preis für Material & & in Währung & ermittelbar
Was verursacht dieses Problem? Because the company code currency is not the same as the controlling area currency, the system is attempting to calc...
KV172
Kalkulation zum Kundenauftrag & & nicht vorhanden
Was verursacht dieses Problem? The system is attempting to determine the target costs on the basis of a sales order cost estimate. If you are using...
KV173
Kalkulation zum Projekt & nicht vorhanden
Was verursacht dieses Problem? The system is attempting to determine the target costs on the basis of a cost estimate for the project. If you are u...
Klicken Sie auf diesen Link, um alle SAP-Meldungen durchsuchen.