Do you have any question about this error?
Message type: E = Error
Message class: FMBS - Budget structure
Message number: 124
Message text: HHM-Kontierung &1&2 kann in kein Buchungs-Ledger gebucht werden
The budget structure settings do not allow postings to FM account
assignment &V1&&V2& for any of the posting ledgers (the posting ledger
to be used was not known at the time of the check). The check of the
budget structure ended with the return code &V3& for posting ledger 9A
and with the return code &V4& for posting ledger 9B.
The system recognizes the following return codes for the check of
posting addresses:
<ZH>Return code 1:</>
The <DS:DE.FMBS_FLG_PO_CHECK>check of posting addresses</> is switched
on. However the FM account assignment &V1&&V2& is missing in the budget
structure. Insert this account assignment in the budget structure for
the posting ledger &V3&.
<ZH>Return code 2:</>
The <DS:DE.FMBS_FLG_PO_CHECK>check of posting addresses</> is switched
off, but the validation of posting addresses does not allow posting on
this address. Check the implementation of the Business Add-In (BAdI)
<DS:SIMG.FMBS_VALID_ADDRESS>Validate Budget and Posting Addresses in BS
</>.
<ZH>Return code 3:</>
The FM account assignment &V1&&V2& leads to a conflict when defining a
<DS:DE.FMKU_GROUPING_KEY>grouping key</> within the context of the
budget structure. Check the implementation of the Business Add-In (BAdI)
<DS:SIMG.FMKU_GROUPING_KEY>Define Grouping Key</>.
<ZH>Return code 4:</>
The derivation strategy used for deriving the budget address from the
posting address derives an invalid budget address. You can use the
program for <DS:TRAN.FMBS_STAT>displaying of budget structure settings
</> to find out which derivation strategy is used. Check the
<DS:SIMG._ISPSFM_N_DERIVE_BO> Derivation Strategy for BudgetAddresses</>
in Customizing. This error may also be caused by inconsistent
customizing of active FM account assignment elements in BCS and FM. This
can be checked in IMG activity <DS:SIMG._ISPSFM_N_V_FMDIMSTA>Activate
Account Assignment Elements in Budget Control System</>.
Processing stops.
Check the budget structure settings according to the given return code.
Das System gibt eine Fehlermeldung aus und erlaubt Ihnen nicht, mit dieser Transaktion fortzufahren, bis der Fehler behoben ist.
Fehlermeldungsextrakt aus SAP-System. Copyright SAP SE
FMBS124
- HHM-Kontierung &1&2 kann in kein Buchungs-Ledger gebucht werden ?Get instant SAP help. Start your 7-day free trial now.
FMBS123
HHM-Kontierung &1&2 kann nicht in Buchungs-Ledger &3 gebucht werden
Was verursacht dieses Problem? The budget structure settings do not allow posting to the FM account assignment &V1&&V2&. The check...
FMBS122
HHM-Kontierung &1&2 kann in Budgetkategorie &3 nicht budgetiert werden
Was verursacht dieses Problem? The budget structure settings do not allow budgeting for FM account assignment &V1&&V2&. The check ...
FMBS125
Budgetkontierung &1&2 kann nicht aus Budgetstrukturplan gelöscht werden
Was verursacht dieses Problem? You cannot remove the FM acount assignment &V1&&V2& from the budget structure for the following both...
FMBS126
Buchungskontierung &1&2 kann nicht aus Budgetstrukturplan gelöscht werden
Was verursacht dieses Problem? There is data on the FM account assignment &V1&&V2& which you want to remove from the budget structu...
Klicken Sie auf diesen Link, um alle SAP-Meldungen durchsuchen.