How To Fix FMBS123 - HHM-Kontierung &1&2 kann nicht in Buchungs-Ledger &3 gebucht werden


SAP Error Message - Details

  • Message type: E = Error

  • Message class: FMBS - Budget structure

  • Message number: 123

  • Message text: HHM-Kontierung &1&2 kann nicht in Buchungs-Ledger &3 gebucht werden

  • Show details Hide details
  • Was verursacht dieses Problem?

    The budget structure settings do not allow posting to the FM account
    assignment &V1&&V2&. The check of the budget structure ended with the
    return code <ZH>&V4&</>.
    The system recognizes the following return codes for the check of
    posting addresses:
    <ZH>Return code 1:</>
    The option of <DS:DE.FMBS_FLG_PO_CHECK>check of posting addresses</> is
    <ZK>check posting address list only</> or <ZK>check both addresses
    (posting and derived budget addresses)</>. However, FM account
    assignment &V1&&V2& is missing in the budget structure. Insert this
    account assignment in the budget structure for the posting ledger &V3&.
    <ZH>Return code 2:</>
    The option of <DS:DE.FMBS_FLG_PO_CHECK>check of posting addresses</> is
    <ZK>check derived budget address only</> or <ZK>do not check addresses
    </>, but the validation of posting addresses does not allow posting on
    this address. Check the implementation of the Business Add-In (BAdI)
    <DS:SIMG.FMBS_VALID_ADDRESS>Validate Budget and Posting Addresses in BS
    </>.
    <ZH>Return code 3:</>
    The FM account assignment &V1&&V2& leads to a conflict when you define a
    <DS:DE.FMKU_GROUPING_KEY>grouping key</> within the context of the
    budget structure. Check the implementation of the Business Add-In (BAdI)
    <DS:SIMG.FMKU_GROUPING_KEY>Define Grouping Key</>.
    <ZH>Return code 4:</>
    The derivation strategy used for deriving the budget address from the
    posting address derives an invalid budget address. You can use the
    program for <DS:TRAN.FMBS_STAT>displaying of budget structure settings
    </> to find out which derivation strategy is used. Check the
    <DS:SIMG._ISPSFM_N_DERIVE_BO> Derivation Strategy for Budget Addresses
    </> in Customizing. This error may also be caused by inconsistent
    customizing of active FM account assignment elements in BCS and FM. This
    can be checked in IMG activity <DS:SIMG._ISPSFM_N_V_FMDIMSTA>Activate
    Account Assignment Elements in Budget Control System</>.

    Systemantwort

    Processing stops.

    Wie behebe ich diesen Fehler?

    Check the budget structure settings according to the given return code.

    Vorgehensweise für Systemadministratoren

    Das System gibt eine Fehlermeldung aus und erlaubt Ihnen nicht, mit dieser Transaktion fortzufahren, bis der Fehler behoben ist.


    Fehlermeldungsextrakt aus SAP-System. Copyright SAP SE


Smart SAP Assistant

  • Was ist die Ursache und Lösung für den SAP Fehler FMBS123 - HHM-Kontierung &1&2 kann nicht in Buchungs-Ledger &3 gebucht werden ?




    • Do you have any question about this error?


      Upgrade now to chat with this error.


Instant HelpGet instant SAP help. Start your 7-day free trial now.


Zugehörige SAP-Fehlermeldungen

Klicken Sie auf die Links unten, um die folgenden verwandten Nachrichten anzuzeigen:

Klicken Sie auf diesen Link, um alle SAP-Meldungen durchsuchen.


Rating
The AI Support Assistant is great. It provides comprehensive assistance even on the most difficult issues. I highly recommend this service.
Rate 1
John Jordan
SAP Consultant & Author