How To Fix FARR_INFLIGHT_CHECK051 - C26: Betrag f. prosp. Abspaltung ist inkonsistent für LV &1 in Vertrag &2


SAP Error Message - Details

  • Message type: E = Error

  • Message class: FARR_INFLIGHT_CHECK -

  • Message number: 051

  • Message text: C26: Betrag f. prosp. Abspaltung ist inkonsistent für LV &1 in Vertrag &2

  • Show details Hide details
  • Was verursacht dieses Problem?

    Contract change can either be:
    ?Contract modification
    ?Change of estimates.

    Das System gibt eine Fehlermeldung aus und erlaubt Ihnen nicht, mit dieser Transaktion fortzufahren, bis der Fehler behoben ist.

    Depending on the Customizing ( Configure Accounting Principle-specific
    Settings) for a company code and accounting principle, one or the other
    is applied when the scope of a contract is changed.
    The change mode for a POB is determined by the field CHANGE_MODE (only
    in the buffer, not written to database) and can be one of the following:
    ?'P' or 'V' prospective change
    ?'R' retrospective change
    ?' ' (empty) no change
    Prospective change
    In case of a prospective change the system performs a prospective split
    on the deferral items. The deferral item which corresponds to an open
    reconciliation key in the period of the contract change is flaged with
    the prospective split flag (PRO_SPLIT = 'X').
    The split amount represents the revenue amount posted plus the scheduled
    revenue amount from the period prior to the current change.
    The example below illustrates this:
    RECON_KEY,,POB_ID,,CONDITION_TYPE,,REV_AMT_DELTA,,REV_AMT_POSTED,,
    PRO_AMT_CUMULATE,,HAS_PRO_SPLIT,,LATEST_DEFITEM
    201802001,,POB1,,PR00,,1000.00,,0.00,,0.00,,-,,-
    201803001,,POB1,,PR00,,1000.00,,1000.00,,0.00,,-,,-
    201803002,,POB1,,PR00,,- 500.00,,1000.00,,1000.00,,X,,-
    201804001,,POB1,,PR00,,1000.00,, 500.00,,1000.00,,-,,-
    201805001,,POB1,,PR00,,1000.00,,1500.00,,1000.00,,-,,X
    In this example, a contract modification was performed in period
    2018/03. Therefore the split amount is calculated and the prospective
    split flag set. All deferral items, beginning from the contract change
    period, are updated with the split amount (PRO_AMT_CUMULATE).
    If the split amount is not the total of the posted and scheduled revenue
    from the previous period (not necessarily previous reconciliation key!),
    a C26 inflight check error is raised.

    Systemantwort

    The RAI processing is stopped or the manual transaction from the UI is
    stopped.

    Wie behebe ich diesen Fehler?

    You can search for SAP notes related to inflight check C26 by using the
    terms FARR_INFLIGHT_CHECK and C26.
    You can also check if there is inconsistent data already in the system.

    Vorgehensweise für Systemadministratoren


    Fehlermeldungsextrakt aus SAP-System. Copyright SAP SE


Smart SAP Assistant

  • Was ist die Ursache und Lösung für den SAP Fehler FARR_INFLIGHT_CHECK051 - C26: Betrag f. prosp. Abspaltung ist inkonsistent für LV &1 in Vertrag &2 ?




    • Do you have any question about this error?


      Upgrade now to chat with this error.


Instant HelpGet instant SAP help. Start your 7-day free trial now.


Zugehörige SAP-Fehlermeldungen

Klicken Sie auf die Links unten, um die folgenden verwandten Nachrichten anzuzeigen:

Klicken Sie auf diesen Link, um alle SAP-Meldungen durchsuchen.


Rating
The AI Support Assistant is great. It provides comprehensive assistance even on the most difficult issues. I highly recommend this service.
Rate 1
John Jordan
SAP Consultant & Author