Message type: E = Error
Message class: DPR_SHARED - Development Projects: Messages for Shared Objects
Message number: 208
Message text: &1 &2: Termine liegen außerhalb des Gültigkeitsbereichs des Kalenders
If you schedule &V1& '&V2&', it would have dates that lie outside of
the validity period of the calendar.
The system does not carry out scheduling.
Check the set dates and duration of the project elements for their
correctness.
If the dates are correct then extend the validity period of the factory
calendar.
Fehlermeldungsextrakt aus SAP-System. Copyright SAP SE
DPR_SHARED208
- &1 &2: Termine liegen außerhalb des Gültigkeitsbereichs des Kalenders ?Get instant SAP help. Start your 7-day free trial now.
DPR_SHARED207
Verknüpfungen bilden Zyklus - Terminierung nicht möglich
Was verursacht dieses Problem? The links form a <ZH>loop</>; scheduling is not possible.Systemantwort The links between the project e...
DPR_SHARED206
&1 &2: Starteinschränkung kollidiert mit Termin eines Nachfolgers
Was verursacht dieses Problem? When backward scheduling the project element, the system calculated a start date based on a successor relationship a...
DPR_SHARED209
&1 '&2' ist nicht änderbar
Was verursacht dieses Problem? &V1& '&V2&' is opened in display mode only, or its status does not allow you to make chang...
DPR_SHARED210
Keine Berechtigung zum Terminieren von &1 '&2'
Was verursacht dieses Problem? You do not have sufficient authorization to carry out scheduling for &V1& '&V2&'.Systemant...