Message type: E = Error
Message class: CP - Task list messages: Core data
Message number: 806
Message text: Material & Werk & : ÜbergZeit nicht auf Basismengeneinh. umrechenbar
You want to update the scheduling data for material &V1& in plant &V2&.
However, this is not possible for interoperation time because an error
(for example, field overflow) occurred while converting the base unit
of measure in the routing to the base unit of measure in the material
master.
Check base units of measure in the material master and routing.
Fehlermeldungsextrakt aus SAP-System. Copyright SAP SE
CP806
- Material & Werk & : ÜbergZeit nicht auf Basismengeneinh. umrechenbar ?Get instant SAP help. Start your 7-day free trial now.
CP805
Material & Werk & : Rüstzeit nicht auf Basismengeneinh. umrechenbar
Was verursacht dieses Problem? You want to update scheduling data for material &V1& in plant &V2&. However, this is not possible fo...
CP804
Material & Werk & : BearbZeit nicht auf Basismengeneinh. umrechenbar
Was verursacht dieses Problem? You want to update the scheduling data for material &V1& in plant &V2&. However, this is not possibl...
CP807
Markieren Sie 'MatStamm direkt aktualisieren'
Was verursacht dieses Problem? You want to update the material master record with the scheduling results from the routing and copy the assembly scr...
CP808
Das konfigurierbare Material & Werk & wurde nicht berücksichtigt
Was verursacht dieses Problem? You want to schedule routings and then copy the resulting internal processing times into the material master. Howeve...
Klicken Sie auf diesen Link, um alle SAP-Meldungen durchsuchen.