Message type: E = Error
Message class: CP - Task list messages: Core data
Message number: 805
Message text: Material & Werk & : Rüstzeit nicht auf Basismengeneinh. umrechenbar
You want to update scheduling data for material &V1& in plant &V2&.
However, this is not possible for setup time because an error (for
example, field overflow) occurred while converting the base unit of
measure in the routing to the base unit of measure in the material
master.
Check the base units of measure in the material master and routing.
Fehlermeldungsextrakt aus SAP-System. Copyright SAP SE
CP805
- Material & Werk & : Rüstzeit nicht auf Basismengeneinh. umrechenbar ?Get instant SAP help. Start your 7-day free trial now.
CP804
Material & Werk & : BearbZeit nicht auf Basismengeneinh. umrechenbar
Was verursacht dieses Problem? You want to update the scheduling data for material &V1& in plant &V2&. However, this is not possibl...
CP803
Material & Werk & ist bereits in Bearbeitung
Selbsterklärende Nachricht Da SAP der Meinung ist, dass diese spezielle Fehlermeldung 'selbsterklärend' ist, wurden keine weiteren Informationen geg...
CP806
Material & Werk & : ÜbergZeit nicht auf Basismengeneinh. umrechenbar
Was verursacht dieses Problem? You want to update the scheduling data for material &V1& in plant &V2&. However, this is not possibl...
CP807
Markieren Sie 'MatStamm direkt aktualisieren'
Was verursacht dieses Problem? You want to update the material master record with the scheduling results from the routing and copy the assembly scr...
Klicken Sie auf diesen Link, um alle SAP-Meldungen durchsuchen.