How To Fix CNV_20100203 - Merge auf A/B-Ebene: Keine Prioritätssteuerung bei Merge auf Kostenart &1


SAP Error Message - Details

  • Message type: E = Error

  • Message class: CNV_20100 - Messageclass for chart of account conversion

  • Message number: 203

  • Message text: Merge auf A/B-Ebene: Keine Prioritätssteuerung bei Merge auf Kostenart &1

  • Show details Hide details
  • Was verursacht dieses Problem?

    It was found that two or more old cost elements ae mapped to target &V1&
    , but the priority indicator is set for none of these.
    If the priority indicator is not set, it is not clear which settings
    will take priority when the cost elements are merged into &V1&.
    Besides, the check showed that the merge will take place at
    <DS:TX.CNV_20100_TX_ASEGMENT>A level</> as well as at
    <DS:TX.CNV_20100_TX_BSEGMENT>B level</>.
    The following cost elements in controlling area &V4& are merged at B
    level:
    &V2& -> &V1&
    &V3& -> &V1&

    Wie behebe ich diesen Fehler?

    Set the priority indicator for one of the entries with target cost
    element &V1&.

    Das System gibt eine Fehlermeldung aus und erlaubt Ihnen nicht, mit dieser Transaktion fortzufahren, bis der Fehler behoben ist.

    &NOTE&
    It is possible to do the conversion without setting the priority
    indicator. In this case, however, you should check the A and B segment
    settings for the cost element &V1& after the merge.
    &ADDITIONAL_HINTS&
    This message is also displayed if the merge is implicit. In this case,
    the log will contain another message for target &V1&, which describes
    the recommended next steps.
    The priority indicator must not be set more than <ZH>once</> for all
    merges to a given target. This is also valid for cross-chart of accounts
    merges.
    The super priority is mainly useful for tables whose key contains the
    chart of accounts ID, but no other field that needs to be converted in a
    chart of accounts conversion, such as account assignment (table T030 and
    others).
    Note also that even if a <DS:TX.CNV_20100_TX_SUPERPRIO>super priority</>
    was defined at chart of accounts level it is still not clear which
    settings (from which account/cost element) will prevail during a merge
    to a given target if <ZH>more than one</> account/cost element from the
    <ZH>same</> chart of accounts is merged into this target.

    Fehlermeldungsextrakt aus SAP-System. Copyright SAP SE


Smart SAP Assistant

  • Was ist die Ursache und Lösung für den SAP Fehler CNV_20100203 - Merge auf A/B-Ebene: Keine Prioritätssteuerung bei Merge auf Kostenart &1 ?




    • Do you have any question about this error?


      Upgrade now to chat with this error.


Instant HelpGet instant SAP help. Start your 7-day free trial now.


Zugehörige SAP-Fehlermeldungen

Klicken Sie auf die Links unten, um die folgenden verwandten Nachrichten anzuzeigen:

Klicken Sie auf diesen Link, um alle SAP-Meldungen durchsuchen.


Rating
ERPlingo's SAP support assistant is amazing. Saves me countless hours trying to solve complex SAP issues myself. It's a real game changer!
Rate 1
Thomas Michael
SAP Consultant, Author & Speaker