How To Fix CNV_20100202 - Merge auf A-Ebene: Keine Prioritätssteuerung bei Merge auf Kostenart &1


SAP Error Message - Details

  • Message type: E = Error

  • Message class: CNV_20100 - Messageclass for chart of account conversion

  • Message number: 202

  • Message text: Merge auf A-Ebene: Keine Prioritätssteuerung bei Merge auf Kostenart &1

  • Show details Hide details
  • Was verursacht dieses Problem?

    The system found that two or more old cost elements are mapped to target
    &V1&, but the priority indicator is set for none of these.
    If the priority indicator is not set, it is not clear which settings
    will take priority when the cost elements are merged into &V1&.
    Besides, the check showed that the merge will only take place at
    <DS:TX.CNV_20100_TX_ASEGMENT>A level</>, while no merge will take place
    at <DS:TX.CNV_20100_TX_BSEGMENT>B level</>.

    Wie behebe ich diesen Fehler?

    Set the priority indicator for one of the entries with target cost
    element &V1&.
    &NOTE&
    It is possible to do the conversion without setting the priority
    indicator. In this case, however, you should check the A segment se
    ttings for the cost element &V1& after the merge.

    Das System gibt eine Fehlermeldung aus und erlaubt Ihnen nicht, mit dieser Transaktion fortzufahren, bis der Fehler behoben ist.

    &ADDITIONAL_HINTS&
    This message is also displayed if the merge is implicit. In this case,
    the log will contain another message for target &V1& that describes the
    recommended next steps.
    The priority indicator must not be set more than <ZH>once</> for all
    merges to a given target. This is also valid for cross-chart of accounts
    merges.
    The super priority is mainly useful for tables whose key contains the
    chart of accounts ID, but no other field that needs to be converted in a
    chart of accounts conversion, such as account assignment (table T030 and
    others).
    Note also that even if a <DS:TX.CNV_20100_TX_SUPERPRIO>super priority</>
    was defined at chart of accounts level it is still not clear which
    settings (from which account/cost element) will prevail during a merge
    to a given target if <ZH>more than one</> account/cost element from the
    <ZH>same</> chart of accounts is merged into this target.

    Fehlermeldungsextrakt aus SAP-System. Copyright SAP SE


Smart SAP Assistant

  • Was ist die Ursache und Lösung für den SAP Fehler CNV_20100202 - Merge auf A-Ebene: Keine Prioritätssteuerung bei Merge auf Kostenart &1 ?




    • Do you have any question about this error?


      Upgrade now to chat with this error.


Instant HelpGet instant SAP help. Start your 7-day free trial now.


Zugehörige SAP-Fehlermeldungen

Klicken Sie auf die Links unten, um die folgenden verwandten Nachrichten anzuzeigen:

Klicken Sie auf diesen Link, um alle SAP-Meldungen durchsuchen.


Rating
ERPlingo's SAP support assistant is amazing. Saves me countless hours trying to solve complex SAP issues myself. It's a real game changer!
Rate 1
Thomas Michael
SAP Consultant, Author & Speaker