Stop googling SAP errors. Use our Free Essentials plan instead - no credit card needed. Start Now

Close

How To Fix CJ051 - PSP-Element & ist kein Kontierungselement


SAP Error Message - Details

  • Message type: E = Error

  • Message class: CJ - Project master data and structure

  • Message number: 051

  • Message text: PSP-Element & ist kein Kontierungselement

  • Show details Hide details
  • Was verursacht dieses Problem?

    Because the WBS element &V1& is not defined as an
    <GL:account_assignment_element>account assignment element</>, you
    cannot make any actual or commitment postings.

    Systemantwort

    INCLUDE 'NA_ALLG_NOVERARBEITUNG' OBJECT DOKU ID TX

    Wie behebe ich diesen Fehler?

    You can correct this by entering a WBS element that is defined as an
    account assignment element.
    If you want to post to WBS element &V1& then you must first get it
    changed into an account assignment element by the system administrator
    or other authorized person such as the project manager.
    Procedure for system administrator:
    Set the account assignment indicator for the WBS element &V1&.

    Fehlermeldungsextrakt aus SAP-System. Copyright SAP SE


Smart SAP Assistant

  • Was ist die Ursache und Lösung für den SAP Fehler CJ051 - PSP-Element & ist kein Kontierungselement ?




    • Do you have any question about this error?


      Upgrade now to chat with this error.


Instant HelpGet instant SAP help. Sign up for our Free Essentials Plan.


Zugehörige SAP-Fehlermeldungen

Klicken Sie auf die Links unten, um die folgenden verwandten Nachrichten anzuzeigen:

Klicken Sie auf diesen Link, um alle SAP-Meldungen durchsuchen.


Rating
ERPlingo's SAP support assistant is amazing. Saves me countless hours trying to solve complex SAP issues myself. It's a real game changer!
Rate 1
Thomas Michael
SAP Consultant, Author & Speaker