Message text: Jahressumme der Cash-Flows wegen Eingabe im Jahr &1 zu groß.
As the result of entering planned (negative) costs or revenue in year
&V1&, the cumulative value (added over all years) of the cash flow
exceeds the maximum number of pre-decimal places (&V2&) after the
tranlation from &V3& to &V4&.
The maximum allowed number of pre-decimal places in the planning table
is based on the currency-specific number of decimal places and the
scaling factor that you entered in the planning profile.
It is not possible to transfer the value.
Adjust the plan values so that the cumulative annual value does not
exceed &V2& pre-decimal places.
Fehlermeldungsextrakt aus SAP-System. Copyright SAP SE
AO_PLANNING019
- Jahressumme der Cash-Flows wegen Eingabe im Jahr &1 zu groß. ?Get instant SAP help. Start your 7-day free trial now.
AO_PLANNING018
Jahressumme Gemein/Investitionskosten wegen Eingabe im Jahr &1 zu groß.
Was verursacht dieses Problem? As the result of entering planned investment or overhead costs in year &V1&, the cumulative value (added ove...
AO_PLANNING017
Summe Erträge überschreitet durch Eingabe im Jahr &1 maximale Größe.
Was verursacht dieses Problem? As the result of entering revenue in year &V1&, the cumulative revenue exceeds the maximum number of pre-dec...
AO_PLANNING020
Kapitalwert kann in Objektwährung &2 nicht berechnet werden.
Was verursacht dieses Problem? The system determines the net present value in object currency &V2& internally by translating controlling ar...
AO_PLANNING021
Planwertübernahme wegen abweichender Objektwährung nicht möglich.
Was verursacht dieses Problem? Appropriation request &v1& has a different object currency (&v2&) than WBS element &v3& (&am...