How To Fix AO_PLANNING019 - Jahressumme der Cash-Flows wegen Eingabe im Jahr &1 zu groß.


AO_PLANNING019 - Overview

  • Message type: E = Error

  • Message class: AO_PLANNING - Message Class for Project WGRS-4B4R6S

  • Message number: 019

  • Message text: Jahressumme der Cash-Flows wegen Eingabe im Jahr &1 zu groß.

  • Show details Hide details
  • Was verursacht dieses Problem?

    As the result of entering planned (negative) costs or revenue in year
    &V1&, the cumulative value (added over all years) of the cash flow
    exceeds the maximum number of pre-decimal places (&V2&) after the
    tranlation from &V3& to &V4&.
    The maximum allowed number of pre-decimal places in the planning table
    is based on the currency-specific number of decimal places and the
    scaling factor that you entered in the planning profile.

    Systemantwort

    It is not possible to transfer the value.

    Wie behebe ich diesen Fehler?

    Adjust the plan values so that the cumulative annual value does not
    exceed &V2& pre-decimal places.

    Fehlermeldungsextrakt aus SAP-System. Copyright SAP SE


AO_PLANNING019 - Details








Instant HelpGet instant SAP help. Sign up for our Free Essentials Plan.


Zugehörige SAP-Fehlermeldungen

Klicken Sie auf die Links unten, um die folgenden verwandten Nachrichten anzuzeigen:

Klicken Sie auf diesen Link, um alle SAP-Meldungen durchsuchen.


Rating
ERPlingo simplifies finding the accurate answers to SAP message errors. I now use every week. A must have tool for anyone working with SAP! Highly recommended!
Rate 1
Kent Bettisworth
Executive SAP Consultant