Do you have any question about this error?
Message type: E = Error
Message class: AO_PLANNING - Message Class for Project WGRS-4B4R6S
Message number: 018
Message text: Jahressumme Gemein/Investitionskosten wegen Eingabe im Jahr &1 zu groß.
As the result of entering planned investment or overhead costs in year
&V1&, the cumulative value (added over all years) of investment and
overhead costs exceeds the maximum number of pre-decimal places (&V2&)
after the tranlation from &V3& to &V4&.
The maximum allowed number of pre-decimal places in the planning table
is based on the currency-specific number of decimal places and the
scaling factor that you entered in the planning profile.
It is not possible to transfer the value.
Adjust the plan values for investment costs and overhead so that the
cumulative annual value does not exceed &V2& pre-decimal places.
Fehlermeldungsextrakt aus SAP-System. Copyright SAP SE
AO_PLANNING018
- Jahressumme Gemein/Investitionskosten wegen Eingabe im Jahr &1 zu groß. ?Get instant SAP help. Start your 7-day free trial now.
AO_PLANNING017
Summe Erträge überschreitet durch Eingabe im Jahr &1 maximale Größe.
Was verursacht dieses Problem? As the result of entering revenue in year &V1&, the cumulative revenue exceeds the maximum number of pre-dec...
AO_PLANNING016
Summe Investitionskosten durch Eingabe im Jahr &1 zu groß.
Was verursacht dieses Problem? As the result of entering investment costs in year &V1&, the cumulative investment costs exceed the maximum ...
AO_PLANNING019
Jahressumme der Cash-Flows wegen Eingabe im Jahr &1 zu groß.
Was verursacht dieses Problem? As the result of entering planned (negative) costs or revenue in year &V1&, the cumulative value (added over...
AO_PLANNING020
Kapitalwert kann in Objektwährung &2 nicht berechnet werden.
Was verursacht dieses Problem? The system determines the net present value in object currency &V2& internally by translating controlling ar...
Klicken Sie auf diesen Link, um alle SAP-Meldungen durchsuchen.