Do you have any question about this t-code?
Transaction Code: S_AP9_75000088
Description: Activité IMG : APO_PPS_CDPSC3
Release: S/4HANA only
Menu Path:
Program: SAPLS_CUS_IMG_ACTIVITY
Screen: 200
Authorization Object:
Development Package: APOC
Package Description: IMG/Customizing for APO
Parent Package: /SAPAPO/APO_STRUCTURE
Module/Component: SCM-APO-CA
Description: APO Cross-Application Components
Overview: S_AP9_75000088 is an SAP transaction code used to access the IMG Activity APO_PPS_CDPSC3 in the SAP system. This activity is part of the Production Planning and Detailed Scheduling (PP/DS) component of the SAP Advanced Planning and Optimization (APO) module. Functionality: The IMG Activity APO_PPS_CDPSC3 allows users to define the settings for the Capacity Planning and Detailed Scheduling (CDPS) process in the PP/DS module. This includes setting up the planning horizon, defining the scheduling parameters, and configuring the capacity requirements. Step-by-step How to Use: 1. Enter transaction code S_AP9_75000088 into the command field in the SAP system. 2. Select IMG Activity APO_PPS_CDPSC3 from the list of activities. 3. Follow the instructions in each of the sub-activities to configure the settings for Capacity Planning and Detailed Scheduling. 4. Once all settings have been configured, save your changes and exit the activity. Other Recommendations: It is recommended that users familiarize themselves with all of the settings available in this activity before making any changes. Additionally, it is important to test any changes made in a test environment before applying them to a production environment.
S_AP9_75000087 - Activité IMG : APO_PPS_CDPSC4...
S_AP9_75000086 - Activité IMG : APO_PPS_CDPSC5...
S_AP9_75000089 - Activité IMG : APO_PPS_CDPSC2...
S_AP9_75000090 - Activité IMG : APO_PPS_CDPSC1...