How to use REXCFC - Calculer la consommation


SAP Transaction Code - Details

  • Transaction Code: REXCFC

    Description: Calculer la consommation

    Release: S/4HANA and ECC 6

    Menu Path:

    • Accounting > Flexible Real Estate Management > Country/Region Specifics > Switzerland > Fuel Management > Determine Consumption
  • Show technical details Hide technical details
    • Program: RFREXCFCC

      Screen: 1000

      Authorization Object:

    • Development Package: RE_XC_SC_FC

      Package Description:

      Parent Package:

    • Module/Component:

      Description:


Smart SAP Assistant

  • SAP Tcode: REXCFC - Calculer la consommation
    
    Overview: 
    The SAP transaction code REXCFC is used to determine the consumption of materials in a production order. It is used to calculate the amount of material that is consumed in a production order and to compare it with the planned consumption. 
    
    Functionality: 
    The REXCFC transaction code allows users to view the actual consumption of materials in a production order. It also allows users to compare the actual consumption with the planned consumption. The transaction code also provides information about the differences between the actual and planned consumption. 
    
    Step-by-step How to Use: 
    1. Enter the REXCFC transaction code in the command field. 
    2. Enter the production order number in the Order field. 
    3. Select the “Display” button to view the actual and planned consumption of materials for the production order. 
    4. Select the “Compare” button to compare the actual and planned consumption of materials for the production order. 
    5. Select the “Differences” button to view any differences between the actual and planned consumption of materials for the production order. 
    6. Select the “Back” button to return to the main screen of REXCFC. 
    7. Select the “Exit” button to exit from REXCFC transaction code. 
    
    Other Recommendations: 
    It is recommended that users check for any differences between actual and planned consumption of materials before closing a production order, as this will help ensure that all materials have been consumed as planned and that no additional costs are incurred due to incorrect material usage.
    • Do you have any question about this t-code?


      Upgrade now to chat with this t-code.

Related SAP Transaction Codes

Click the links below to see the following related SAP tcodes:

Rating
ERPlingo's SAP support assistant is amazing. Saves me countless hours trying to solve complex SAP issues myself. It's a real game changer!
Rate 1
Thomas Michael
SAP Consultant, Author & Speaker