How to use OS80 - Tableau planif. REM (gén. + ordonn.)


SAP Transaction Code - Details

  • Transaction Code: OS80

    Description: Tableau planif. REM (gén. + ordonn.)

    Release: S/4HANA and ECC 6

  • Show technical details Hide technical details
    • Program:

      Screen: 0

      Authorization Object:

    • Development Package: MD04

      Package Description: Repetitive Manufacturing

      Parent Package: APPL

    • Module/Component: PP-REM

      Description: Repetitive Manufacturing


Smart SAP Assistant

  • SAP Tcode: OS80 - Tableau planif. REM (gén. + ordonn.)
    
    Overview: 
    The SAP transaction code OS80 is used to access the REM Planning Table (General + Scheduling). This table is used to plan and manage the resources and materials needed for production orders. It is a part of the Production Planning and Control (PP/C) module in SAP. 
    
    Functionality: 
    The REM Planning Table (General + Scheduling) allows users to plan and manage resources and materials for production orders. It provides an overview of the planned resources and materials, as well as their availability. The table also allows users to view the planned production orders, their status, and any changes that have been made. Additionally, users can view the planned costs associated with each production order. 
    
    Step-by-step How to Use: 
    1. Access the REM Planning Table (General + Scheduling) by entering transaction code OS80 in the SAP command field. 
    2. Select the desired production order from the list of available orders. 
    3. View the planned resources and materials for the selected order, as well as their availability. 
    4. View the planned costs associated with each production order. 
    5. Make any necessary changes to the planned resources or materials for the selected order. 
    6. Save your changes and exit the REM Planning Table (General + Scheduling). 
    
    Other Recommendations: 
    It is recommended that users familiarize themselves with all of the features of the REM Planning Table (General + Scheduling) before using it to plan and manage resources and materials for production orders. Additionally, users should ensure that all changes made to the planned resources or materials are saved before exiting the table.
    • Do you have any question about this t-code?


      Upgrade now to chat with this t-code.

Related SAP Transaction Codes

Click the links below to see the following related SAP tcodes:
  • OS73 - ECH : workflow enreg. modif. objet...

  • OS72 - ECH : workflow demande/ordre modif....

  • OS81 - Table planif. REM (affich. lignes)...

  • OSC1 - Gestion des types de rendez-vous...


Rating
ERPlingo simplifies finding the accurate answers to SAP message errors. I now use every week. A must have tool for anyone working with SAP! Highly recommended!
Rate 1
Kent Bettisworth
Executive SAP Consultant