How to use MCPW - Analyse article : cycle de fabr.


SAP Transaction Code - Details

  • Transaction Code: MCPW

    Description: Analyse article : cycle de fabr.

    Release: S/4HANA and ECC 6

    Menu Path:

    • Information Systems > Logistics > Production > Material > Lead times
    • Information Systems > General Report Selection > Production Planning > Information Systems > Production Order Processing > Material Analysis: Lead Time
  • Show technical details Hide technical details
    • Program: RMCF0300

      Screen: 1000

      Authorization Object:

    • Development Package: MCF

      Package Description: R/3 application development: Shop Floor Information System

      Parent Package: APPL

    • Module/Component: PP-IS

      Description: Information System


Smart SAP Assistant

  • SAP Tcode: MCPW - Analyse article : cycle de fabr.
    
    Overview:
    MCPW is a SAP transaction code used to analyze the lead time of materials in the system. It provides an overview of the lead time for each material, allowing users to identify any potential delays in the supply chain. 
    
    Functionality:
    MCPW allows users to view the lead time for each material in the system. This includes the total lead time, as well as the individual components that make up the total lead time. The transaction code also provides an overview of the current stock levels and any potential delays in the supply chain. 
    
    Step-by-step How to Use:
    1. Enter MCPW into the SAP command field and press enter. 
    2. Select the material you wish to analyze from the list of available materials. 
    3. The system will display an overview of the lead time for that material, including total lead time and individual components that make up the total lead time. 
    4. The system will also display an overview of current stock levels and any potential delays in the supply chain. 
    5. Once you have reviewed all relevant information, you can exit out of MCPW by pressing F3 or selecting “Back” from the menu bar. 
    
    Other Recommendations:
    It is recommended that users review their materials’ lead times on a regular basis to ensure that there are no unexpected delays in their supply chain. Additionally, users should take advantage of MCPW’s ability to view current stock levels and any potential delays in order to better plan for future orders and deliveries.
    • Do you have any question about this t-code?


      Upgrade now to chat with this t-code.

Related SAP Transaction Codes

Click the links below to see the following related SAP tcodes:
  • MCPU - Analyse ordre de fabr. : exécution...

  • MCPS - Analyse opération : cycle de fabr....

  • MCPY - Analyse poste travail : cycle fabr....

  • MCQ. - SIP : sélection analyse Kanban...


Rating
ERPlingo's SAP support assistant is amazing. Saves me countless hours trying to solve complex SAP issues myself. It's a real game changer!
Rate 1
Thomas Michael
SAP Consultant, Author & Speaker