How to use KPRW - Analyse des ressources utilisées


SAP Transaction Code - Details

  • Transaction Code: KPRW

    Description: Analyse des ressources utilisées

    Release: S/4HANA and ECC 6

  • Show technical details Hide technical details
    • Program: COKP0003

      Screen: 1000

      Authorization Object:

    • Development Package: KBAS

      Package Description: Overhead Cost Controlling

      Parent Package: APPL

    • Module/Component: CO-OM

      Description: Overhead Cost Controlling


Smart SAP Assistant

  • SAP Tcode: KPRW - Analyse des ressources utilisées
    
    Overview:
    KPRW is a transaction code used in SAP to evaluate the resources used in a project. It is used to analyze the resources used in a project and to determine if they are being used efficiently. This transaction code is part of the Project System module. 
    
    Functionality: 
    KPRW allows users to view the resources used in a project and to analyze their usage. It also allows users to compare the resources used in different projects and to identify any potential areas of improvement. Additionally, KPRW can be used to generate reports on resource usage, which can be used for further analysis. 
    
    Step-by-step How to Use: 
    1. Enter transaction code KPRW into the command field. 
    2. Select the project you wish to evaluate from the list of available projects. 
    3. Select the type of resource you wish to evaluate (e.g., personnel, materials, etc.). 
    4. Select the period for which you wish to evaluate the resource usage (e.g., current month, previous month, etc.). 
    5. Select the type of report you wish to generate (e.g., resource utilization report, resource comparison report, etc.). 
    6. Generate the report and analyze the results. 
    
    Other Recommendations: 
    It is recommended that users familiarize themselves with the various options available in KPRW before using it for evaluation purposes. Additionally, users should ensure that they have access to all relevant data before attempting to generate a report using KPRW. Finally, users should consult with their system administrator if they have any questions or concerns about using KPRW.
    • Do you have any question about this t-code?


      Upgrade now to chat with this t-code.

Related SAP Transaction Codes

Click the links below to see the following related SAP tcodes:
  • KPRO - Administration KPRO...

  • KPRN - Copier schéma pré-budg. ressources...

  • KPRZ - Valoris. a posteriori p-budg. recet....

  • KPSI - Rapproch. budget CCA...


Rating
ERPlingo's SAP support assistant is amazing. Saves me countless hours trying to solve complex SAP issues myself. It's a real game changer!
Rate 1
Thomas Michael
SAP Consultant, Author & Speaker