How to use CN24 - Ordonnancement réseau dét. global


SAP Transaction Code - Details

  • Transaction Code: CN24

    Description: Ordonnancement réseau dét. global

    Release: S/4HANA and ECC 6

    Menu Path:

    • Logistics > Project System > Dates > Overall Network Scheduling
    • Accounting > Project System > Dates > Overall Network Scheduling
  • Show technical details Hide technical details
    • Program: SAPLCOKO

      Screen: 3000

      Authorization Object: C_PROJ_TCD

    • Development Package: CN_NET_OPR

      Package Description: Operative Network

      Parent Package: APPL

    • Module/Component: PS-ST-OPR-NET

      Description: Network and Activity


Smart SAP Assistant

  • SAP Tcode: CN24 - Ordonnancement réseau dét. global
    
    Overview:
    SAP transaction code CN24 is used to create and maintain overall network scheduling. It is a part of the SAP Logistics Execution System (LES) and is used to plan and manage the transportation of goods from one location to another. 
    
    Functionality: 
    CN24 allows users to create and maintain overall network scheduling for transportation of goods. It enables users to plan and manage the transportation of goods from one location to another. The scheduling can be done for both inbound and outbound shipments. It also allows users to view the status of shipments, such as whether they are in transit or have been delivered. 
    
    Step-by-step How to Use: 
    1. Enter transaction code CN24 in the SAP command field. 
    2. Select the “Overall Network Scheduling” option from the menu. 
    3. Enter the relevant data, such as shipment number, origin, destination, etc. 
    4. Select the “Create” button to create a new overall network schedule. 
    5. Enter the relevant data for the new schedule, such as shipment date, delivery date, etc. 
    6. Select the “Save” button to save the new schedule. 
    7. To view existing schedules, select the “Display” button and enter the relevant data, such as shipment number, origin, destination, etc. 
    8. To edit an existing schedule, select the “Change” button and enter the relevant data for the schedule that needs to be changed. 
    9. Select the “Save” button to save any changes made to an existing schedule. 
    10. To delete an existing schedule, select the “Delete” button and enter the relevant data for the schedule that needs to be deleted. 
    11. Select the “Save” button to save any changes made to an existing schedule or delete an existing schedule. 
    
    Other Recommendations: 
    It is recommended that users familiarize themselves with all of the features available in CN24 before using it for overall network scheduling purposes. Additionally, users should ensure that all data entered into CN24 is accurate and up-to-date in order to ensure efficient scheduling of shipments and deliveries.
    • Do you have any question about this t-code?


      Upgrade now to chat with this t-code.

Related SAP Transaction Codes

Click the links below to see the following related SAP tcodes:
  • CN23 - Afficher réseau...

  • CN22 - Modifier réseau...

  • CN24N - Ordonnancement réseau dét. global...

  • CN25 - Confirmer réseau...


Rating
The AI Support Assistant is great. It provides comprehensive assistance even on the most difficult issues. I highly recommend this service.
Rate 1
John Jordan
SAP Consultant & Author