How to use CA83 - Réseaux standard pour poste travail


SAP Transaction Code - Details

  • Transaction Code: CA83

    Description: Réseaux standard pour poste travail

    Release: S/4HANA and ECC 6

    Menu Path:

    • Logistics > Project System > Basic Data > Master Data > Work Center > Usage > Work Center
    • Logistics > Project System > Information System > Structures > Where-Used Lists > Standard Networks for Work Center
    • Accounting > Project System > Basic Data > Master Data > Work Center > Usage > Work Center
    • Accounting > Project System > Information System > Structures > Where-Used Lists > Standard Networks for Work Center
    • Information Systems > Project System > Structures > Where-Used Lists > Standard Networks for Work Center
    • Information Systems > General Report Selection > Project System > Structures > Where-Used Lists > Standard Networks for Work Center
  • Show technical details Hide technical details
    • Program: SAPMC27V

      Screen: 130

      Authorization Object: C_PROJ_TCD

    • Development Package: CPV

      Package Description: R/3 Application development: Routing Where-Used Lists

      Parent Package: APPL

    • Module/Component: PP-BD-RTG

      Description: Routing


Smart SAP Assistant

  • SAP Tcode: CA83 - Réseaux standard pour poste travail
    
    Overview:
    CA83 is a SAP transaction code used to create and maintain standard networks for work centers. It is used to define the sequence of operations and activities that are necessary to complete a production order. This transaction code is part of the Production Planning (PP) module in SAP. 
    
    Functionality: 
    CA83 allows users to create and maintain standard networks for work centers. It enables users to define the sequence of operations and activities that are necessary to complete a production order. This includes defining the sequence of operations, assigning resources, and setting up routing information. The standard network can then be used as a template for creating production orders. 
    
    Step-by-step How to Use: 
    1. Enter the transaction code CA83 in the command field. 
    2. Enter the work center for which you want to create a standard network. 
    3. Select the “Create” button to create a new standard network. 
    4. Enter the details of the operations and activities that are necessary to complete the production order. 
    5. Assign resources and set up routing information for each operation or activity. 
    6. Select the “Save” button to save your changes. 
    7. Select the “Activate” button to activate your standard network. 
    
    Other Recommendations: 
    It is recommended that users familiarize themselves with the different options available in CA83 before creating a standard network for a work center. Additionally, users should ensure that all operations and activities are correctly defined and assigned resources before activating the standard network.
    • Do you have any question about this t-code?


      Upgrade now to chat with this t-code.

Related SAP Transaction Codes

Click the links below to see the following related SAP tcodes:
  • CA82 - Cas d'emploi poste trav. EQUI...

  • CA81 - Utilisation ressources dans recette...

  • CA85 - Remplacer poste travail...

  • CA85N - Modif. en masse - Poste de travail...


Rating
ERPlingo's SAP support assistant is amazing. Saves me countless hours trying to solve complex SAP issues myself. It's a real game changer!
Rate 1
Thomas Michael
SAP Consultant, Author & Speaker