How to use MD40 - Proceso de planificación-MPS


SAP Transaction Code - Details

  • Transaction Code: MD40

    Description: Proceso de planificación-MPS

    Release: S/4HANA and ECC 6

    Menu Path:

    • Logistics > Production > Production Planning > MPS > MPS > Total Planning > Online
    • Logistics > Production - Process > Production Planning > MPS > MPS > Total Planning > Online
  • Show technical details Hide technical details
    • Program: SAPMM61X

      Screen: 110

      Authorization Object:

    • Development Package: MD03

      Package Description: Application Devt ERP MPS/Deterministic Requirements Planning

      Parent Package: APPL

    • Module/Component: PP-MRP-BD

      Description: Master Data


Smart SAP Assistant

  • SAP Tcode: MD40 - Proceso de planificación-MPS
    
    Overview:
    The SAP transaction code MD40 is used to run the Material Requirements Planning (MRP) planning run. This planning run is used to determine the material requirements for a given period of time. It takes into account the current stock levels, planned orders, and forecasted demand. The output of the planning run is a list of planned orders that can be used to replenish stock levels. 
    
    Functionality: 
    The MD40 transaction code is used to run the MRP planning run. This planning run takes into account the current stock levels, planned orders, and forecasted demand. The output of the planning run is a list of planned orders that can be used to replenish stock levels. The MRP planning run also takes into account any safety stock levels that have been set up in the system. 
    
    Step-by-step How to Use: 
    1. Enter the transaction code MD40 in the command field. 
    2. Enter the material number for which you want to run the MRP planning run. 
    3. Select the “Planning Run” option from the menu bar. 
    4. Select the “Execute” button to start the MRP planning run. 
    5. The output of the MRP planning run will be displayed in a list format with details such as material number, quantity, and date of delivery for each planned order. 
    6. Select the “Save” button to save the output of the MRP planning run. 
    7. Select the “Back” button to return to the main menu screen. 
    
    Other Recommendations: 
    It is recommended that you review and analyze the output of the MRP planning run before taking any action on it. This will help ensure that you are making informed decisions about your material requirements and inventory levels. Additionally, it is important to keep in mind that any changes made to safety stock levels or forecasted demand will affect the output of the MRP planning run and should be taken into consideration when reviewing its results.
    • Do you have any question about this t-code?


      Upgrade now to chat with this t-code.

Related SAP Transaction Codes

Click the links below to see the following related SAP tcodes:
  • MD27 - Visualizar periodos PPS...

  • MD26 - Modificar periodos PPS...

  • MD41 - Planif. individual MPS -var niveles-...

  • MD42 - Planif. individual MPS -un nivel-...


Rating
ERPlingo's SAP support assistant is amazing. Saves me countless hours trying to solve complex SAP issues myself. It's a real game changer!
Rate 1
Thomas Michael
SAP Consultant, Author & Speaker