How to use CN61 - Grafo estándar


CN61 - Overview

  • Transaction Code: CN61

    Description: Grafo estándar

    Release: S/4HANA and ECC 6

    Menu Path:

    • Logistics > Project System > Information System > Structures > Change Documents > For Standard Network
    • Accounting > Project System > Information System > Structures > Change Documents > For Standard Network
    • Information Systems > Project System > Structures > Change Documents > For Standard Network
    • Information Systems > General Report Selection > Project System > Structures > Change Documents > For Standard Network
  • Show technical details Hide technical details
    • Program: SAPLCPBL

      Screen: 2010

      Authorization Object: C_PROJ_TCD

    • Development Package: CP

      Package Description: R/3 Application Development: PP Task Lists

      Parent Package: APPL

    • Module/Component: PP-BD-RTG

      Description: Routing


CN61 - Details

  • SAP Tcode: CN61 - Grafo estándar
    
    Overview:
    SAP transaction code CN61 is used to create and maintain standard networks in the SAP system. Standard networks are used to plan and manage the production process. They are used to define the sequence of operations and activities that need to be completed in order to produce a product or service. 
    
    Functionality: 
    The CN61 transaction code allows users to create, edit, and delete standard networks. It also allows users to view and analyze existing standard networks. The transaction code also provides users with the ability to assign resources, such as machines, personnel, and materials, to the network. 
    
    Step-by-step How to Use: 
    1. Enter the transaction code CN61 in the command field. 
    2. Select the “Create” option from the menu bar. 
    3. Enter a name for the network in the “Network Name” field. 
    4. Enter a description for the network in the “Description” field. 
    5. Select a type for the network from the drop-down menu (e.g., production, maintenance, etc.). 
    6. Enter a start date for the network in the “Start Date” field. 
    7. Enter an end date for the network in the “End Date” field (optional). 
    8. Select a status for the network from the drop-down menu (e.g., active, inactive, etc.). 
    9. Assign resources to the network by selecting them from the list of available resources (e.g., machines, personnel, materials). 
    10. Click “Save” to save your

    Already have an account? Login here!

CN61 - Related Tcodes

  • CN60 - Docum.modificación p.proyect./grafos...

  • CN55N - Resumen: Posiciones doc.comercial...

  • CN65 - Doc.de modificación de orden/grafo...

  • CN70 - Resumen: variante proceso fondo...


Rating
ERPlingo's SAP support assistant is amazing. Saves me countless hours trying to solve complex SAP issues myself. It's a real game changer!
Rate 1
Thomas Michael
SAP Consultant, Author & Speaker