How to use WPDTC - Planned Delivery Time Calculation


SAP Transaction Code - Details

  • Transaction Code: WPDTC

    Description: Planned Delivery Time Calculation

    Release: S/4HANA and ECC 6

    Menu Path:

    • Logistics > Materials Management > Purchasing > Master Data > Planned Delivery Time Calculation
    • Logistics > Logistics Execution > JIT Outbound > Environment > Purchasing > Master Data > Planned Delivery Time Calculation
    • Logistics > Logistics Execution > JIT Inbound > Environment > Purchasing > Master Data > Planned Delivery Time Calculation
    • Logistics > Production > Kanban > Environment > Purchasing > Master Data > Planned Delivery Time Calculation
  • Show technical details Hide technical details
    • Program: PDTC_REPORT

      Screen: 1000

      Authorization Object: S_TCODE

    • Development Package: WPDTC

      Package Description:

      Parent Package:

    • Module/Component:

      Description:


Smart SAP Assistant

  • SAP Tcode: WPDTC - Planned Delivery Time Calculation
    
    Overview: 
    The SAP transaction code WPDTC stands for Planned Delivery Time Calculation. This transaction code is used to calculate the planned delivery time for a material in the SAP system. It is used to determine the expected delivery date of a material based on the current stock levels and the planned orders. 
    
    Functionality: 
    The WPDTC transaction code is used to calculate the planned delivery time for a material in the SAP system. It takes into account the current stock levels, planned orders, and other factors such as lead times and safety stock levels. The result of the calculation is a date that represents when the material is expected to be delivered. 
    
    Step-by-step How to Use: 
    1. Enter the transaction code WPDTC in the command field. 
    2. Enter the material number for which you want to calculate the planned delivery time. 
    3. Enter any additional parameters such as lead times and safety stock levels if necessary. 
    4. Click “Execute” to run the calculation. 
    5. The result of the calculation will be displayed on the screen, showing the expected delivery date of the material. 
    
    Other Recommendations: 
    It is important to note that this transaction code should only be used as an estimate of when a material will be delivered, as there may be other factors that can affect the actual delivery date. Additionally, it is recommended that users check with their suppliers to confirm any expected delivery dates before placing an order.
    • Do you have any question about this t-code?


      Upgrade now to chat with this t-code.

Related SAP Transaction Codes

Click the links below to see the following related SAP tcodes:
  • WPDC - SRS - PDC Processing...

  • WPCW - Repeat settlement run...

  • WPED - Sales Audit Editor...

  • WPER - POS interface monitor...


Rating
The AI Support Assistant is great. It provides comprehensive assistance even on the most difficult issues. I highly recommend this service.
Rate 1
John Jordan
SAP Consultant & Author