How to use S_AP9_75000087 - IMG Activity: APO_PPS_CDPSC4


SAP Transaction Code - Details

  • Transaction Code: S_AP9_75000087

    Description: IMG Activity: APO_PPS_CDPSC4

    Release: S/4HANA only

    Menu Path:

    • Logistics > Advanced Planning > Production Planning > Environment > Current Settings > Maintain Time Profiles
  • Show technical details Hide technical details
    • Program: SAPLS_CUS_IMG_ACTIVITY

      Screen: 200

      Authorization Object:

    • Development Package: APOC

      Package Description: IMG/Customizing for APO

      Parent Package: /SAPAPO/APO_STRUCTURE

    • Module/Component: SCM-APO-CA

      Description: APO Cross-Application Components


Smart SAP Assistant

  • SAP Tcode: S_AP9_75000087 - IMG Activity: APO_PPS_CDPSC4
    
    Overview: 
    S_AP9_75000087 is an SAP transaction code used to access the IMG Activity APO_PPS_CDPSC4. This activity is part of the Production Planning and Detailed Scheduling (PP/DS) component of the SAP Advanced Planning and Optimization (APO) module. 
    
    Functionality: 
    The IMG Activity APO_PPS_CDPSC4 allows users to define the parameters for the Capacity Planning and Detailed Scheduling (CDPS) process. This includes setting up the planning horizon, defining the scheduling parameters, and configuring the capacity requirements. 
    
    Step-by-step How to Use: 
    1. Enter transaction code S_AP9_75000087 in the SAP command field. 
    2. Select IMG Activity APO_PPS_CDPSC4 from the list of activities. 
    3. Set up the planning horizon by entering a start date and end date for the planning period. 
    4. Define the scheduling parameters, such as the scheduling type, scheduling direction, and scheduling interval. 
    5. Configure the capacity requirements by entering a capacity requirement type, capacity requirement unit, and capacity requirement value. 
    6. Save your changes and exit the activity. 
    
    Other Recommendations: 
    It is recommended that users familiarize themselves with all of the parameters available in IMG Activity APO_PPS_CDPSC4 before making any changes to ensure that they are properly configured for their specific needs. Additionally, users should always test their changes in a non-production environment before deploying them in production.
    • Do you have any question about this t-code?


      Upgrade now to chat with this t-code.

Related SAP Transaction Codes

Click the links below to see the following related SAP tcodes:

Rating
ERPlingo simplifies finding the accurate answers to SAP message errors. I now use every week. A must have tool for anyone working with SAP! Highly recommended!
Rate 1
Kent Bettisworth
Executive SAP Consultant